慈林醫(yī)院地上大面積停車場的設(shè)計與施工
朱保兵,徐曉明,周宇慶,陳重力
- 摘 要
-
朱保兵,徐曉明,周宇慶,陳重力(上海建筑設(shè)計研究院有限公司, 上海 200041)[摘要]介紹了慈林醫(yī)院地上大面積停車場的設(shè)計與施工過程??紤]到建筑的主入口位于建筑的2層,南側(cè)停車場采用現(xiàn)澆鋼筋混凝土框架體系,東側(cè)停車場采用地上大面積堆土的形式。重點描述了大面積堆土停車場設(shè)計過程中遇到的問題和解決的辦法。通過綜合技術(shù)措施,控制和減小了大面積堆土停車場在施工過程中對主體結(jié)構(gòu)和周邊環(huán)境造成的影響。[關(guān)鍵詞]設(shè)計與施工; 大面積堆土; 停車場; 綜合技術(shù)措施中圖分類號:TU318文獻標(biāo)識碼:A文章編號:1002848X(2013)12002504Design and construction of large overground car park of Cilin hospitalZhu Baobing, Xu Xiaoming, Zhou Yuqing, Chen Zhongli(Shanghai Institute of Architectural Design & Research Co., Ltd., Shanghai 200041, China)Abstract:The design and construction of large overground car park of Cilin hospital was introduced. Considering that the building′s main entrance is on the second floor, RC frame system is used in the south car park, while east car park takes the form of large soil heaping on the ground. Solutions to the problems in the design of east car park were highlighted. Through comprehensive technical measures, the impact of construction of east car park on the main structure and environment around was controlled and reduced.Keywords:design and construction; large soil heaping; car park; comprehensive technical measure*上海市青年科技啟明星計劃項目(11QB1403200),上海建筑設(shè)計研究院青年科研基金項目(院青111類0056結(jié))。作者簡介:朱保兵,博士,高級工程師,Email:bingbaozhu@163.com。參考文獻[1]慈林醫(yī)院在建項目巖土工程勘察報告[R].杭州:浙江省工程勘察院,2010.[2]GB 50223—2008 建筑工程抗震設(shè)防分類標(biāo)準(zhǔn)[S].北京:中國建筑工業(yè)出版社,2008.[3]JGJ 94—2008 建筑樁基技術(shù)規(guī)范[S].北京:中國建筑工業(yè)出版社,2008.[4]GB 50007—2002 建筑地基基礎(chǔ)設(shè)計規(guī)范[S].北京:中國建筑工業(yè)出版社,2002.[5]江正榮.地基與基礎(chǔ)工程施工禁忌手冊[M].北京:機械工業(yè)出版社, 2005.[6]劉金波.建筑樁基技術(shù)規(guī)范理解與應(yīng)用[M].北京:中國建筑工業(yè)出版社, 2008.