884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2012年>> 增刊02期>>正文內(nèi)容
OpenSees軟件的前后處理技術(shù)及其在連續(xù)倒塌分析中的應(yīng)用
劉傳卿1'2, 梅佐云1, 孫海峰3
摘 要

 

劉傳卿1'2,  梅佐云1,  孫海峰3
(1山東省建筑科學(xué)研究院,濟(jì)南250031;2哈爾濱工業(yè)大學(xué)土木工程學(xué)院,哈爾濱150006;3天頌建設(shè)集團(tuán)有限公司,臺(tái)州317500)
 
[摘要] 為使OpenSees軟件的計(jì)算功能得到充分的發(fā)揮,借助ANSYS平臺(tái),利用APDL語(yǔ)言編寫(xiě)了ANSYS與OpenSees軟件之間的數(shù)據(jù)接口,利用ANSYS強(qiáng)大的前后處理模塊建立有限元模型并顯示計(jì)算結(jié)果,從而實(shí)現(xiàn)數(shù)值分析的可視化。借助本文編制的數(shù)據(jù)接口程序,針對(duì)某鋼框架結(jié)構(gòu)開(kāi)展了連續(xù)倒塌分析,分析結(jié)果表明:剩余結(jié)構(gòu)的抗倒塌機(jī)制依據(jù)破壞位置的不同而發(fā)生改變;在中柱破壞的工況下,剩余結(jié)構(gòu)具備抗彎?rùn)C(jī)制與懸鏈線機(jī)制提供抗倒塌承載能力;在邊柱破壞的工況下,剩余結(jié)構(gòu)僅依靠抗彎?rùn)C(jī)制提供抗倒塌承載能力。
[關(guān)鍵詞] 數(shù)據(jù)接口程序;可視化建模;連續(xù)倒塌;抗倒塌機(jī)制
中圖分類號(hào):TU352    文獻(xiàn)標(biāo)識(shí)碼:A  文章編號(hào):1002-848X(2012) S2-0213-04
 
Pre- and post-processing technology of OpenSees and application in analytical investigation of progressive collapse
Liu Chuanqing 1,2.Mei Zuoyun 1, Sun Haifeng3
(1 Shandong Provincial Academy of Building Research, Jinan 250031, China; 2 Harbin Institute of Technology, Harbin 150006, China; 3 Tiansong Construction Group Limited Company, Taizhou 317500, China)
 
Abstract: In order to turn OpenSees software to advantage,a new data-interface routine between OpenSees and ANSYS is presented in this paper, using APDL language of ANSYS software, to realize the process of visual modeling and visualization of calculating results. Based on the data-interface routine, an analysis of progressive collapse for planar steel frame structure is camed out. Analytical results show that residual structure has the different resistance mechanism for the different column removal case. In the case of middle column removal, both bending resistance and catenary action resistance become the resistance mechanism of the residual frame structure; on the other hand, only bending resistance could provide resistance capacity of progressive collapse in the case of side column removal.
Keywords: data-interface routine; visual modeling; progressive collapse; resistance mecharusm for collapse
下載地址

    你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!

    如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!

    如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!