- 摘 要
-
劉 斌1,黃坤耀2
(1 現(xiàn)代設(shè)計(jì)集團(tuán)上海民港國際建筑設(shè)計(jì)有限公司,上海200011;2 上海維固工程實(shí)業(yè)有限公司,上海200235)[摘要] 本文結(jié)合實(shí)際改建工程,對(duì)舊房中的預(yù)應(yīng)力空心板樓面進(jìn)行加固處理,使其在荷載增加、板肋被開洞打斷等情況下仍能滿足承載力等要求。因預(yù)制板的加固無規(guī)范依據(jù),工程中通過現(xiàn)場(chǎng)載荷試驗(yàn),進(jìn)行了預(yù)應(yīng)力空心板加固前后的結(jié)構(gòu)性能檢測(cè),試驗(yàn)證明加固后的預(yù)制板能夠滿足使用要求。
[關(guān)鍵詞] 預(yù)制板;預(yù)應(yīng)力空心板;碳纖維加固Strengtherung on Prefabricated Floorslab in a Rebuilding Project
Liu Bin1, Huang Kunyao2
(1 Xian Dai Architectural Design Group, Shanghai MingKong Intemational Design Co., Ltd., Shanghai 200011, China; 2 Shanghai WeiGu Engineering Technology Co., Ltd., Shanghai 200235, China)Abstract: This paper presents the strengthening method in a real rebuilding project. The precast prestressed hollow floorslab in the old building need to be strengthened to satisfy the demand of weight bearing because the load is increased or the rib of the hollow slab is broken by circle punching. Because there is no code description particularly on the strengthening on a precast prestressed hollow slab, a on-the-spot load test was held to inspect the performance of it before and after the strengthening. The test proves that the strengthening works and the slab after strengthening can meet the demand of use.
Keywords: precast slab; prestressed hollow slab; CFRP strengthening
- 下載地址
-
你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!