884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現在的位置:建筑結構>> 期 刊>> 2009年>> 增刊01期>>正文內容
南京新百塔樓續(xù)建加固設計
左 江,陶鶴進,吳 棟,吳靖坤
摘 要

左  江,陶鶴進,吳  棟,吳靖坤
(南京市建筑設計研究院有限責任公司,南京210005)

[摘要] 新百三期塔樓是在已建二期塔樓(八層)上進行續(xù)建,已建的二期部分塔樓設計依據是“89”系列規(guī)范,因續(xù)建后總高度和總面積的增加、兩次設計執(zhí)行規(guī)范的差異、超限高層抗震性能設計的要求,需對已建部分的框架柱、梁柱節(jié)點和核心筒進行加固。著重介紹了柱身、梁柱節(jié)點、核心筒加固設計原則、目的和方法。
[關鍵詞] 框架柱;核心筒;鋼骨;勁性;梁柱節(jié)點;續(xù)建;加固;鋼板

Reinforcement Design for Subsequent Construction of the Xinjiekou Department Store Tower
Zuo Jiang, Tao Hejin, Wu Dong, Wu Jingkun
( Nanjing Architectural Design & Research Institue Co. , Ltd. , Nanjing  210005, China)

Abstract: The third phase of Nanjing Xinjiekou department store tower is constructed on the eighth floor of its second phase,  which is designed according to the' 89'  series standard. Because of the increase of total height and gross area after subsequent construction, the difference between two designs carried out by different standard, and the request for ultra limited high-level earthquake-resistance performance design, the core tube, the constructed frame column and the beam column node must be reinforced. Emphasize the design principle, goal and method of the reinforcement for column, the beam column node and the core tube for the above reasons.
Keywords: frame column; core tube; steel reinforced; stiffness; beam column node; subsequent construction, sereinforcement; armor plate

下載地址

    你還沒注冊?或者沒有登錄?這篇論文要求至少是本站的注冊會員才能閱讀!

    如果你還沒注冊,請趕緊點此注冊吧!

    如果你已經注冊但還沒登錄,請趕緊點此登錄吧!