- 摘 要
-
王曉潔,陸道淵,魏豐登,趙 明,王進琦
(現(xiàn)代設(shè)計集團華東建筑設(shè)計研究院有限公司,上海200002)[摘要] 工程采用全落地剪力墻結(jié)構(gòu),建筑高度超過了《高規(guī)》規(guī)定的7度區(qū)B級高度的規(guī)定,達到175.6m。工程以專家意見為指導,采用彈性動力時程分析和彈塑性靜力分析等方法研究結(jié)構(gòu)在地震作用下的動力性能,研究結(jié)構(gòu)的抗震構(gòu)造措施,以達到結(jié)構(gòu)設(shè)計的技術(shù)先進、安全適用、經(jīng)濟合理的要求。
[關(guān)鍵詞] 剪力墻;超限高層;彈塑性分析Study on the Super High-rise Shearwall Structure
Wang Xiaojie, Lu Daoyuan, Wei Fengdeng, Zhao Ming, Wang Jinqi
( East China Architecture Design&Research Institute Co., Ltd ,Xian Dai Architectural Design Croup, Shanghai 200002, China)Abstract: Shearwall structure was used in this project. The construction height surpasses B level in Technical specification for concrete structures of tall building in the seismic fortification intensity 7 area, and achieves 175. 6m. We use elastic-dynamic time-history analysis and pushover analysis under earthquake action to research the performance and seismic fortification measures.
Keywords: shearwall structure; high-rise building structure; pushover analysis