屈曲約束支撐-鋼筋混凝土框架結(jié)構(gòu)的設(shè)計(jì)與分析
朱江1,2,李幗昌3,馬傳正3
- 摘 要
-
朱江1,2,李幗昌3,馬傳正3(1 大連理工大學(xué)土木工程學(xué)院,大連 116024;2 沈陽(yáng)大學(xué)建筑工程學(xué)院,沈陽(yáng) 110044;3 沈陽(yáng)建筑大學(xué)土木工程學(xué)院,沈陽(yáng) 110168)[摘要] 利用SAP2000軟件建立包含和不包含屈曲約束支撐的鋼筋混凝土框架計(jì)算模型,分別采用反應(yīng)譜分析和Pushover分析方法對(duì)兩種模型進(jìn)行對(duì)比計(jì)算分析。結(jié)果表明:在純鋼筋混凝土框架結(jié)構(gòu)中合理設(shè)置屈曲約束支撐,可以達(dá)到增加框架結(jié)構(gòu)的側(cè)向剛度、明顯降低結(jié)構(gòu)側(cè)向變形、實(shí)現(xiàn)多道設(shè)防的效果。[關(guān)鍵詞] 鋼筋混凝土框架;屈曲約束支撐;地震反應(yīng)分析中圖分類號(hào):TU352-1 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1002-848X(2012)12-0054-05Analysis and design on buckling restrained braces-reinforced concrete frame structuresZhu Jiang1,2, Li Guochang3, Ma Chuanzheng3(1 School of Civil Engineering, Dalian University of Technology, Dalian 116024, China; 2 School of Construction Engineering, Shenyang University, Shenyang 110044, China; 3 School of Civil Engineering, Shenyang Jianzhu University, Shenyang 110168, China)Abstract: Computer models of buckling restrained braces-reinforced concrete frame and RC frame were set up, and seismic performances of the models were calculated by adopting response spectrum analysis and Pushover analysis based on SAP2000. The results show that the RC frame including buckling restrained braces will increase story-stiffness, decrease lateral deformation of frame structure significantly, and reach requirement of more defences in seismic concept design of buildings.Keywords: RC frame; buckling restrained braces; seismic response analysis作者簡(jiǎn)介:朱江, 講師,博士,Email:z-hujiang@163.com.參考文獻(xiàn)[1] 王亞勇.汶川地震建筑震害啟示——抗震概念設(shè)計(jì)[J].建筑結(jié)構(gòu)學(xué)報(bào),2008,29(4):20-25.[2] YOSHINO T, KARINO Y. Experimental study on shear wall with braces:part 2 [C]// Summaries of Technical Papers of Annual Meeting of the Architectural Institute of Japan. Structural Engineering Section 11, Tokyo, Japan, 1971.[3] FEMA450 NEHRP Recommended provisions for seismic regulations for new buildings and other structures[S]. 2003.[4] AMERICAN INSTITUTE OF STEEL CONSTRUCTION. Seismic provisions for structural steel buildings[S]. AISC, Chicago, 2005.[5] JGJ 3-2002高層建筑混凝土結(jié)構(gòu)技術(shù)規(guī)程[S]. 北京:中國(guó)建筑工業(yè)出版社,2002.[6] 北京金土木軟件技術(shù)有限公司.SAP2000中文版使用指南[M].北京:人民交通出版社,2008.[7] GB 50011-2001建筑抗震設(shè)計(jì)規(guī)范[S].北京:中國(guó)建筑工業(yè)出版社,2001.
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!