884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2010年>> 增刊02期>>正文內(nèi)容
雙曲拱橋承載能力試驗檢測評定
王 彬,李青寧
摘 要

    王  彬,李青寧
    (西安建筑科技大學(xué)土木工程學(xué)院,西安710055)

[摘要] 我國早些時期修建的雙曲拱橋都存在荷載等級偏低、橋面較窄的問題,隨著交通量增加,重載車增多,以及雙曲拱橋本身整體性能較差,存在嚴(yán)重的構(gòu)造缺陷,影響交通運營。主要結(jié)合國內(nèi)某雙曲拱橋的檢測加固方案,闡述雙曲拱橋的病害成因,并詳細(xì)介紹靜載試驗評定雙曲拱橋承載能力的方法,提出相應(yīng)的加固處理建議。
[關(guān)鍵詞] 雙曲拱橋;構(gòu)造缺陷;檢測;靜載試驗;加固

    Carrying capacity assessment test of double arch bridge
   
Wang Bin, Li Qingning
    (School of Civil Engineering, Xi'an University of Architucture and Technology, Xi'an 710055, China)

Abstract: Many hyperbolic arch bridges which were built during the early period of China were designed with low load levels and narrow bridge. As traffic and heavy vehicles increased,as well as poor overall performance of the hyperbolic arch bridge itself, there are serious structural defects, which affect traffic operations. This paper mainly combines with a detection of hyperbolic arch bridge in China, and introduces a method of evaluating the carrying capacity of a bridge though the static loading test in detail and gives some reinforcement advices.
Keywords: hyperbolic arch bridge; structural defects; detection; static load test; reinforcement

下載地址

    你還沒注冊?或者沒有登錄?這篇論文要求至少是本站的注冊會員才能閱讀!

    如果你還沒注冊,請趕緊點此注冊吧!

    如果你已經(jīng)注冊但還沒登錄,請趕緊點此登錄吧!