884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2010年>> 增刊02期>>正文內(nèi)容
某框架樓托梁拔柱改造設(shè)計(jì)與施工
王洪波,王宏林
摘 要

王洪波,王宏林
(北京正邦興業(yè)建筑技術(shù)開發(fā)有限公司,北京100083)

[摘要] 該工程新的使用功能需將原結(jié)構(gòu)居中的1根框架柱拔掉。設(shè)計(jì)中采用混凝土框架梁、柱增大截面法,同時(shí)框架梁雙向跨度變大且形成十字梁。施工中遵循“先加固、后拔柱”的原則,首先對(duì)基礎(chǔ)注漿加固,對(duì)梁、柱分別采用水泥基灌漿料、混凝土增大截面,再行拔柱。
[關(guān)鍵詞] 托梁拔柱;加固

Supporting beam and removing column reform design and construction of a frame structure building
Wang Hongbo,  Wang Honglin
(Beijing Champion Construction Co.,Ltd., Beijing 100083,  China)

Abstract: The construction of new features needs to remove one frame column. The consolidation beam and column design is given by using cross-section increment in the engineer, and extends for the frame beam of the original structure to form cross-beam. Abide by first strengthening then removing the concrete column in construction, first the foundation is reinforced by pressure grouting technology, beams and columns were used cement-based grouting material and concrete to increase cross-section, then remove the frame column.
Keywords: supporting beam;   removing column;  strengthening

下載地址

    你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!

    如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!

    如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!