任玉賀,梁保榮,楊 宏,康 凱,陳績(jī)明
(上海建筑設(shè)計(jì)研究院有限公司,上海200041)[摘要] 為配合上海國(guó)際航運(yùn)服務(wù)中心的建設(shè),須對(duì)原港運(yùn)大廈進(jìn)行改擴(kuò)建,使新港運(yùn)大廈的標(biāo)高和整個(gè)基地相符。拆除4層原結(jié)構(gòu),新建3層樓面,對(duì)層19~27收進(jìn)部分鋼結(jié)構(gòu)進(jìn)行補(bǔ)齊,對(duì)下部3層新建樓面使用傳統(tǒng)外包混凝土加固柱墻方法,新建梁柱節(jié)點(diǎn)外加柱帽箍筋加強(qiáng)剛性節(jié)點(diǎn)。
[關(guān)鍵詞] 拆除;新建;外包混凝土加崮;剛接節(jié)點(diǎn);鉸接節(jié)點(diǎn)Structural reconstruction design of Port Building in Shanghai
Ren Yuhe, Liang Baorong, Yang Hong, Kang Kai, Chen Jiming
(Shanghai Institute ofArchitectural Design & Research (Co., Ltd.), Shanghai 200041, China)Abstract: To cooperate with Shanghai International Shipping Service Center, the Port Building must be reconstructed in order to make the building's elevation conform to the whole base. Demolition four layers and build three new layers, use the steel structures to fill in floor slab of 19-27 layers. The three layers'column and wall of new floor are wrapped with concrete for strengthening, new beam-column joints use column cap stirrup strengthen rigid joint.
Keywords: demolition; new construction, wrapped with concrete for strengthening; rigid connection joint, hinged connection j oint
- 下載地址
-
你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!