- 摘 要
-
陳迎春1,李小飛1,何四祥2
(1 江蘇南通六建建設(shè)集團(tuán)有限公司,南通226500;2北京邁達(dá)斯技術(shù)有限公司,北京100044)[摘要] 隨著高層結(jié)構(gòu)和空問結(jié)構(gòu)的廣泛應(yīng)用以及計(jì)算手段和速度的提高,按照實(shí)際施工順序來模擬結(jié)構(gòu)在施工以及使用狀態(tài)時(shí)的力學(xué)特性顯得越來越有必要。著重介紹了MIDAS/Gen這款通用有限元軟件在施工階段分析模擬中的應(yīng)用研究,以及結(jié)合具體的工程實(shí)例來進(jìn)行分析模擬,用一些圖表結(jié)果來說明一次加載模型分析與施工階段模型分析結(jié)果的差別,便于工程設(shè)計(jì)人員在工程設(shè)計(jì)過程中做出理性的判斷。
[關(guān)鍵字] MIDAS/Gen;施工階段;高層建筑Applied research of Midas/Gen in construction analysis of building structures
ChenYingchun1, LiXiaofei1, He Sixiang2
(1 Jiangsu Nantong Liujian Construction Group Co., Ltd., Nantong 226500, China; 2 Beijing MIDAS Technology Co., Ltd., Beijing 100045, China)Abstract: With the extensive application of the high-level structure and spatial structure and with the improvement of calculate means and speed, it is necessary to simulate structure mechanical properties in the construction and use state. This article focuses on the applied research of finite element analysis simulation software Midas/Gen in construction phase of building analysis simulation. And the combination of specific examples were analyzed and the simulated.Results with some charts illustrates the difference between the construction phase model and one load model which can make the engineermg staffin the engineering design process to make rationaljudgments.
Keywords: MIDAS/Gen; construction phase; high-rise building
- 下載地址
-
你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!