- 摘 要
-
張洪明1,楊 靜2,馮道德1
(1 空軍第一工程總隊,北京100089; 2北京建筑工程學(xué)院,北京100044)[摘要] 某寫字樓工程基坑開挖深度14m,基坑?xùn)|側(cè)12m是一棟16層的住宅樓,基坑南側(cè)2.5m是馬路人行道,基坑西側(cè)18m是一棟10層的寫字樓?;娱_挖深、周邊情況復(fù)雜,鄰近有建筑物和道路。通過技術(shù)經(jīng)濟分析,基坑施工采用錨拉樁支護(hù),以及止水帷幕與管井相結(jié)合降截水的施工方案,實踐證明,取得了較好的工程效果。
[關(guān)鍵詞] 深基坑;支護(hù);降截水;技術(shù)Construction technology of supporting and dewatering of deep foundation pit in an office building project
Zhang Hongming1, Yang Jing2, Feng Daode1
(1 The First Brigade of Construction and Installation of the Chinese Air Force, Beijing 100089, China; 2 Beijing Institute of Civil Engineering and Architecture, Beijing 100044, China)Abstract: Afoundation pit excavation of an office building project is 14m in depth. Around the foundation pit, 12m away in the east is a 16-story residential building, 2.5m away in the south is a street sidewalk, and 18m away in the west is a 10-story office building. According to the deep excavation, complicated circumjacent situation, and the neighborhood of buildings and streets, through the technical and economic analysis, the construction of the deep foundation adopt the anchor piles supporting scheme, as well as the scheme ofwater stop curtain combined with tube-well for dewatering and water cutting off. The method proved effective in practice and achieved good project results.
Keywords: deep foundation pit; supporting; dewatering and water cutting off; technology