- 摘 要
-
秦明德,薛 微,劉延海
(北京中聯(lián)環(huán)建文建筑設計有限公司,北京100086)[摘要] 介紹了針對高地下水位地區(qū),在主體工程完成后停止降水,使帶有地下室的高低跨多層建筑物發(fā)生漂浮傾斜的過程及處理,分析了漂浮傾斜事故的產(chǎn)生原因。介紹了己建建筑物后期采取抗浮措施。
[關鍵詞] 地下水;地下水位;穩(wěn)定水位;最高水位;降水;地下水浮力;抗浮設防水位;抗浮設計;漂??;糾傾;檢測;監(jiān)測Handling for accident of flotation and measures for anti-flotation for a high and low stride multi-storey building
Qin Mingde, Xue Wei, Liu Yanhai
(United Architects &Engineers Co., Ltd., Beijing 100086, China)Abstract: A high and low stride multi-storey building with basement located in the high water table area took place floating and inclining since water lowering measure was terminated after the main part of the structure was completed. The reasons resulted in floating and inclination of the building are analyzed. Meanwhile, the measures to floating resistance for the built structure are introduced.
Keywords: groundwater; groundwaterlevel: stable waterlevel; maximum waterlevel; precipitation; groundwater buoyancy; waterlevel for prevention ofup-floating; Prevention ofup-floating design; float; rectification; detection; supervision