884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結構>> 期 刊>> 2010年>> 增刊01期>>正文內(nèi)容
高低跨建筑物漂浮事故處理及抗浮措施
秦明德,薛 微,劉延海
摘 要

    秦明德,薛  微,劉延海
    (北京中聯(lián)環(huán)建文建筑設計有限公司,北京100086)

[摘要] 介紹了針對高地下水位地區(qū),在主體工程完成后停止降水,使帶有地下室的高低跨多層建筑物發(fā)生漂浮傾斜的過程及處理,分析了漂浮傾斜事故的產(chǎn)生原因。介紹了己建建筑物后期采取抗浮措施。
[關鍵詞] 地下水;地下水位;穩(wěn)定水位;最高水位;降水;地下水浮力;抗浮設防水位;抗浮設計;漂??;糾傾;檢測;監(jiān)測

Handling for accident of flotation and measures for anti-flotation for a high and low stride multi-storey building
Qin Mingde, Xue Wei, Liu Yanhai
(United Architects &Engineers Co., Ltd.,  Beijing 100086, China)

Abstract: A high and low stride multi-storey building with basement located in the high water table area took place floating and inclining since water lowering measure was terminated after the main part of the structure was completed. The reasons resulted in floating and inclination of the building are analyzed. Meanwhile, the measures to floating resistance for the built structure are introduced.
Keywords: groundwater; groundwaterlevel: stable waterlevel; maximum waterlevel; precipitation; groundwater buoyancy;  waterlevel for prevention ofup-floating;  Prevention ofup-floating design;  float;  rectification;  detection; supervision

下載地址

    你還沒注冊?或者沒有登錄?這篇論文要求至少是本站的注冊會員才能閱讀!

    如果你還沒注冊,請趕緊點此注冊吧!

    如果你已經(jīng)注冊但還沒登錄,請趕緊點此登錄吧!