- 摘 要
-
趙佳彥
(山東建筑大學工程鑒定加固研究所,濟南250014)[摘要] 山前斜坡濕陷性黃土地帶建筑物地基防濕陷是土木工程師的重要職責,必須采用綜合措施,解決這個工程技術問題。依據(jù)山區(qū)復雜的地質(zhì)條件和濕陷性黃土的工程特性,利用防水措施、結(jié)構措施、基礎計算和地基處理等方法,根據(jù)不同的情況提出設計方案,探討了基礎的合理性,對類似的工程設計提供工程經(jīng)驗。
[關鍵詞] 山前斜坡;地基濕陷;綜合措施;工程特性Controlling method to prevent wet-subsidence for building's foundation that is located in wet-subsidence loess zones of sloping in front of the mountain
Zhao Jiayan
(Research Institute of Engineering Assessment and Repair of Shandong Jianzhu University, Jinan 250014, China)Abstract: It is very important responsibility for a civil engineer to prevent wet-subsidence for building's foundation that is located in wet-subsidence loess zones of sloping in front of the mountain. It is necessary for us to adopt comprehensive measures in order to solve the engineering technological problem. Based on complex geological conditions of the mountainous area and engineering properties of wet-sinkable yellow soil, waterproofing measures, construction measure, calculation of foundation, ground processing method and others are used. according to diferent causes design plans are suggested, and reasonable foundation is discussed, which might provide engineering experience for design of similar projects.
Keywords: sloping before the mountain; wet-subsidence for foundation; comprehensive measures; engineering properties