- 摘 要
-
林忠發(fā)
(中鋼集團(tuán)工程設(shè)計研究院有限公司,北京100080)[摘要] 以福建鎳鐵實(shí)際工程為例,對巨厚淤泥層地基中沖渣池的設(shè)計進(jìn)行探討,采取“地下連續(xù)墻加樁基加高壓旋噴”綜合處理地基的方法,達(dá)到節(jié)省投資、有效控制施工周期的目地。
[關(guān)鍵詞] 巨厚淤泥層地基;地下連續(xù)墻;樁基;高壓施噴Design of slag flushing tank in the great thick silt-seam ground
Lin Zhongfa
(Sinosteel Engineering Design and Research Institute Co,.Ltd., Beijing 100080,China)Abstract: Take the Fujian ferronickel project as the example; we carry on the discussion about the design of slag flushing tank in the great thick silt-seam ground. It adopts "the underground continuous wall and pile foundation and high pressure jet grouting" method to process the ground foundation, to successfully saving investment and effectively control the construction cycle.
Keyword: great thick silt-seam ground; underground continuous wall; pile foundation; high pressure jet grouting