- 摘 要
-
李相業(yè)
(深圳中廣核工程設(shè)計(jì)有限公司,深圳518057)[摘要] 基于20m跨預(yù)應(yīng)力轉(zhuǎn)換桁架結(jié)構(gòu)設(shè)計(jì)案例,介紹了轉(zhuǎn)換桁架方案優(yōu)化比選的情況,并對(duì)預(yù)應(yīng)力構(gòu)件的設(shè)計(jì)和施工進(jìn)行了分析。相關(guān)思路和方法可供預(yù)應(yīng)力轉(zhuǎn)換桁架結(jié)構(gòu)設(shè)計(jì)參考。
[關(guān)鍵詞] 轉(zhuǎn)換桁架;預(yù)應(yīng)力混凝土;預(yù)應(yīng)力損失;裂縫計(jì)算;后張法施工Conceptual design and optimization oflarge span prestressed transfer truss structure
Li Xiangye
(China Nuclear Power Design Company, LTD (SHEN ZHEN), Shenzhen 518057, China)Abstract: By designing a 20m span transfer structure case, the comparison and optinuzation of the transfer truss project is introduced. The analysis of the prestress components design and construction is done. The method of prestressed transfer truss structure could be consulted in correlation design.
Keywords: transfer truss; prestressed concrete; prestress loss; crack check; post-tensioning method
- 下載地址
-
你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!