- 摘 要
-
方志偉1, 紀(jì) 明2
(1 天津送變電工程公司,天津300161;2 天津市電力公司,天津300010)[摘要] 結(jié)合金角西220kV變電站地質(zhì)情況,對(duì)幾種常用的地基處理方法從技術(shù)角度進(jìn)行分析對(duì)比,結(jié)合經(jīng)濟(jì)分析,選擇出相對(duì)優(yōu)化的地基基礎(chǔ)技術(shù)方案。
[關(guān)鍵詞] 變電站;水泥混凝土;抗?jié)B防腐;技術(shù)措施
中圖分類號(hào):TU473 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1002-848X(2011) S2-0416-03Engineering foundation treatment measure selection of west golden corner substation
Fang Zhiwei1, Ji Ming2
(1 Tianjin Electric Transrmssion and Transformation Engineering Corporation, Tianjin 300161, China; 2 Tianjin Electric Power Corporation, Tianjin 300010, China)Abstract: Combined with the geological condition of west golden comer substation, several commonly used foundation treatment measures were analyzed and compared from the tecluucal angle, the relatively optimal foundation tecluucal scheme was selected with economic analysis.
Keywords: substation; cement concrete; impermeability corrosion prevention; tecluucal measure
- 下載地址
-
你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!