金淑鑫, 羅福盛
(中冶賽迪工程技術(shù)股份有限公司,重慶400013)[摘要] 在老廠改擴建工程中,經(jīng)常遇到新建設(shè)備基礎(chǔ)基坑需在不停產(chǎn)狀態(tài)下開挖,基坑開挖深度超過相鄰既有基礎(chǔ)的情況,因此,基坑支護的安全性、合理性就成為工程能否順利實施的關(guān)鍵問題。介紹了某鋼廠卷取機設(shè)備基礎(chǔ)深基坑支護方案的要點和設(shè)計原則,可供同類設(shè)備基礎(chǔ)基坑支護設(shè)計、施工參考。
[關(guān)鍵詞] 卷取機基礎(chǔ);深基坑;支護
中圖分類號:TU473 文獻標識碼:A 文章編號:1002-848X(2011) S2-0402-04Deep excavation supporting for coiling machine of the heavy and medium plate mill for the steelwork
Jin Shuxin, Luo Fusheng
( CISDI Engineering Co., Ltd., Chongqing 400013, China)Abstract: In the process of reconstruction or expansion of the old plant, it is often encountered that excavation for the new equipment foundation is carried out without stopping the production or that the depth of the excavation is deeper than the adjacent existing foundation. Therefore, the safety and rationality of the excavation supporting become a key point for the smooth implementation of the project. The key points and design principles of the excavation supporting plan for the foundation of the coiling machine were described, which can provide reference for the design and construction for similar projects.
Keywords: coiling machine foundation; deep excavation; supporting