- 摘 要
-
朱保兵
(上海建筑設(shè)計(jì)研究院有限公司,上海200041)[摘要] 闡述了上海市第六人民醫(yī)院綜合樓的結(jié)構(gòu)設(shè)計(jì)過程??偨Y(jié)了醫(yī)療建筑的荷載取值方法。針對(duì)結(jié)構(gòu)的超限情況,設(shè)計(jì)時(shí)采用彈性時(shí)程分析方法進(jìn)行了多遇地震下的補(bǔ)充計(jì)算。重點(diǎn)介紹了新舊建筑之間單跨鋼連廊的設(shè)計(jì)方法和構(gòu)造措施。由于本工程鄰近地鐵,樁基和地下結(jié)構(gòu)的設(shè)計(jì)均考慮了對(duì)周邊環(huán)境產(chǎn)生的影響。
[關(guān)鍵詞] 醫(yī)療建筑;彈性時(shí)程分析;單跨鋼連廊;設(shè)計(jì)方法;構(gòu)造措施
中圖分類號(hào):TU318 文獻(xiàn)標(biāo)識(shí)碼:A 文章編號(hào):1002-848X(2011) S2-0027-05Structural design of Shanghai Sixth People'S Hospital building
Zhu Baobing
( Shanghai Institute of Architectural Design&Research( Co., Ltd.),Shanghai 200041, China)Abstract: Structural design process of Shanghai Sixth People's Hospital building was introduced. Calculation of the medical building load value was summarized. Considering out-of-codes situation, calculations with elastic time history analysis methods were adopted under frequent earthquake. Design methods and structural measures of single-span steel comdor between the old and the new buildings were highlighted. As the project is near the subway, the impact of piles and underground structures design on the surrounding environment were taken into account.
Keywords: medical brulding; elastic time history analysis; single-span steel corridor; design methods, structural measures
- 下載地址
-
你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!