884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2012年>> 第09期>>正文內(nèi)容
天津津塔施工過程結(jié)構(gòu)分析及預(yù)變形技術(shù)*
劉軍進(jìn)1,徐自國1,徐強(qiáng)1,劉楓1,段向勝1,陸道淵2,黃良2,徐麟2,葛冬云3
摘 要
劉軍進(jìn)1,徐自國1,徐強(qiáng)1,劉楓1,段向勝1,陸道淵2,黃良2,徐麟2,葛冬云3
(1 中國建筑科學(xué)研究院, 北京100013; 2 華東建筑設(shè)計(jì)研究院有限公司, 上海200002;3 中建一局集團(tuán)建設(shè)發(fā)展公司, 北京 100102)
 
摘要]重力荷載下,75層的天津津塔超高層建筑豎向構(gòu)件會(huì)出現(xiàn)較明顯的壓縮變形以及相互之間的差異壓縮變形。通過施工過程結(jié)構(gòu)分析及預(yù)變形技術(shù),確定出構(gòu)件加工預(yù)調(diào)值和施工安裝預(yù)調(diào)值,使得建造完成后的結(jié)構(gòu)實(shí)際位形能符合預(yù)期目標(biāo)位形。為提高精度,分析時(shí)計(jì)入了地基不均勻沉降、混凝土收縮徐變對(duì)施工模擬和預(yù)變形值的影響。
關(guān)鍵詞]施工過程結(jié)構(gòu)分析;預(yù)變形;超高層建筑;目標(biāo)位形
中圖分類號(hào):TU973+.23文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):1002-848X(2012)09-0137-05
 
Construction process analysis and pre-deformation technique for Jin Tower in Tianjin
Liu Junjin1, Xu Ziguo1, Xu Qiang1, Liu Feng1, Duan Xiangsheng1, Lu Daoyuan2, Huang Liang2, Xu Lin2, Ge Dongyun3
(1 China Academy of Building Research, Beijing 100013, China; 2 East China Architecture Design & Research Institute Co., Ltd., Shanghai 200002, China; 3 China Construction First Division Group Construction & Development Co., Ltd., Beijing 100102, China)
 
Abstract: Under the gravity load, the vertical members of Jin Tower (75 stories) in Tianjin would have notable compression deformation and difference of compression deformation. To achieve the designing objective shape, the construction process analysis and pre-deformation technique were used to get the preliminary adjustment value of the member size and the erection coordinate. To improve the calculation precision, the differential settlement of the foundation and the shrinkage and creep of concrete were taken into consideration.
Keywords: construction process analysis; pre-deformation; super high-rise building; designing objective shape
*國家科技支撐計(jì)劃資助(2006BAJ01B04)。
作者簡介:劉軍進(jìn),博士,研究員,一級(jí)注冊(cè)結(jié)構(gòu)工程師,Email:liujunjin@cabrtech.com。
 
參考文獻(xiàn)
[1]汪大綏, 陸道淵, 黃良,等. 天津津塔結(jié)構(gòu)設(shè)計(jì)[J]. 建筑結(jié)構(gòu)學(xué)報(bào), 2010,31(S1): 1-7.
[2]中國建筑科學(xué)研究院. 天津津塔施工模擬及預(yù)變形分析綜合報(bào)告[R]. 2008.
下載地址

    你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!

    如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!

    如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!