- 摘 要
-
吳源華, 沈 斌, 徐瑞龍, 錢英欣
(北京市建筑工程研究院有限責(zé)任公司,北京 100039)[摘要] 國家體育館改造工程是對原結(jié)構(gòu)拆除部分鋼骨混凝土梁和鋼骨混凝土柱,并對拆除結(jié)構(gòu)的周邊區(qū)域進(jìn)行加固。為保證結(jié)構(gòu)在拆除過程中的安全,進(jìn)行了全過程的變形和應(yīng)力監(jiān)測,并分析了結(jié)構(gòu)變形和應(yīng)力監(jiān)測結(jié)果。監(jiān)測結(jié)果表明變形和應(yīng)力都在合理的范圍內(nèi),國家體育館改造成功。
[關(guān)鍵詞] 國家體育館;改造;監(jiān)測;變形;應(yīng)力
中圖分類號:TU398 +.2 文獻(xiàn)標(biāo)識碼:A 文章編號:1002-848X( 2012) Sl-0638-04Study on monitor of transformation of National Stadium
Wu Yuanhua, Shen Bin, Xu Ruilong, Qian Yingxin
( Beijing Construction Engineering Research Institute Co., Ltd., Beijing 100039,China)Abstract: The project of transformation of National Stadium is to demolish part of steel reinforced concrete beams and columns, and strengthen the regions where the structures were demolished. In order to ensure the structural safety of removal process, the deformation and stress of structure were monitored, and the results of monitoring were analyzed in detail. The results show that the deformation and stress of the remaining structure are within reasonable ranges, the demolishing of National Stadium is successful.
Keywords: National Stadium; renovation; monitor; deformation; stress