- 摘 要
-
(華南理工大學(xué)建筑設(shè)計(jì)研究院 廣州 510640)
【提要】 佛山體育中心新體育館屋面是輪輻式的全張拉索膜結(jié)構(gòu)。采用非線性有限元法對(duì)結(jié)構(gòu)的找形過(guò)程進(jìn)行了分析,計(jì)算了不同角度風(fēng)荷載作用下結(jié)構(gòu)的風(fēng)壓分布,得到了結(jié)構(gòu)的最大和最小風(fēng)壓及結(jié)構(gòu)整體的變形,對(duì)結(jié)構(gòu)的靜力穩(wěn)定問(wèn)題進(jìn)行了探討。分析結(jié)果表明,整體張拉結(jié)構(gòu)的預(yù)應(yīng)力施加與施工過(guò)程的控制關(guān)系密不可分,應(yīng)注意施工過(guò)程中的分階段分析。
【關(guān)鍵詞】 輪輻式 索膜結(jié)構(gòu) 整體提升 計(jì)算 分析
Design and Analysis of Cablemembrane Roof Structure in New Stadium of Foshan Sports Center/Sun Wenbo,Yang Shuyong(Architecture Design and Research Institute,SCUT, Guangzhou 510640,China)
Abstract:The wheelspoke shaped integral pretension cablemembrane structure is adopted in the new stadium of Foshan sports center.The nonlinear FEM is used to simulate the formfinding process,and the wind pressure distribution of structure under different wind angle actions is calculated.The most disadvantage pressure and the structural deformation are got.The static stability of the structure is discussed.The results show that the pretension adding and construction control of the integral pretension structure are colosed tightly,and the substage analysis should be conducted in construction.
Keywords:wheelspoke; cablemembrane structure; tensegrity;calculation; analysis
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!