- 摘 要
-
(哈爾濱工業(yè)大學(xué) 150090)
【提要】 采用有限元分析軟件ANSYS對一種新型索拱吊掛輕型組合樓蓋結(jié)構(gòu)體系進(jìn)行了靜動力分析,并采用現(xiàn)場實測與計算機仿真分析相結(jié)合的方法對索拱吊掛樓蓋的新型工藝進(jìn)行了分析。結(jié)果表明,結(jié)構(gòu)體系的基頻較高,模態(tài)不密集;撐桿與拱型桁架梁連接處截面是索拱主要的控制截面;施工順序影響整體結(jié)構(gòu)的受力狀態(tài);張拉預(yù)應(yīng)力索可以減小拱梁在使用階段的單元應(yīng)力,但在施工階段,張拉預(yù)應(yīng)力索卻增加了拱梁的壓應(yīng)力,對結(jié)構(gòu)產(chǎn)生了不利影響。
【關(guān)鍵詞】 索拱體系 組合樓蓋 吊掛結(jié)構(gòu) 張拉控制
Study on Static and Dynamic Performance and Construction of Cablearch Suspending
Lightweight Combined Floor /Gao Weicheng,Liu Kai,Liu Zongren(Harbin Institute of Technology,Harbin 150090,China)Abstract:The finite element analysis software ANSYS is used to analyze the static and dynamic performance of a kind of newtype space structure system of cablearch suspending lightweight combined floor,and the method of survey on site combining together with computer emulation is adopted.The results show that the basic frequency is higher and the models are not dense;the major control section of the cablearch structure is the connection of brace strut and arch beam; the construction order influences stress of whole structure, when cables are stretched;cables tensioned may minish elements stress of archbeams in working phase,but it increases the press stress in construction phase which brings disadvantage to the structure.
Keywords:cablearch systems; combined floor; suspended structure; controlled tension