884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2012年>> 第06期>>正文內(nèi)容
基坑開挖及上蓋荷載對(duì)下臥隧道結(jié)構(gòu)的影響分
秦前波,方引晴
摘 要

 秦前波,方引晴     (廣州市設(shè)計(jì)院,廣州 510620)

摘要]廣州珠江新城核心區(qū)市政交通項(xiàng)目金穗路以北地下空間基坑位于地鐵隧道正上方,基坑開挖、工程(人工挖孔)樁及上蓋荷載施工對(duì)地鐵隧道結(jié)構(gòu)的影響為該工程的關(guān)鍵問題。為此,利用MIDAS/GTS建立有限元模型,對(duì)實(shí)際的施工工況進(jìn)行模擬。研究結(jié)果表明:隧道結(jié)構(gòu)處于中風(fēng)化地層的變形量?jī)H為強(qiáng)風(fēng)化地層的1/3;近距離人工挖孔樁、隧道上方上蓋荷載施工及增大轉(zhuǎn)換梁的剛度均能在一定程度上約束隧道的水平和豎向變形;土體偏壓開挖對(duì)隧道結(jié)構(gòu)水平方向變形影響較大。根據(jù)研究結(jié)果,提出對(duì)下方既有隧道的保護(hù)措施,以確保地鐵結(jié)構(gòu)安全和正常運(yùn)營(yíng),為設(shè)計(jì)和施工提供指導(dǎo)意見。
關(guān)鍵詞]基坑開挖;盾構(gòu)隧道;變形增量;上蓋荷載;轉(zhuǎn)換梁;數(shù)值模擬
中圖分類號(hào):TU753.1文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):1002-848X(2012)06-0107-05
 
Study on influence of deep excavation and cover load on the underlying subway tunnel structure
Qin Qianbo, Fang Yinqing
(Guangzhou Design Institute, Guangzhou 510620, China)
 
Abstract: The deep excavation of the municipal traffic project in the north of Jinsui Road in the core area of Zhujiang New Town in Guangzhou is above the operating subway tunnels, so the impact of foundation pit excavation, engineering (artificial dig-hole) pile construction and the cover load on the subway tunnels become a key issue. For this reason, a model was established and the actual construction conditions were simulated using MIDAS software. The results show that: the deformation increment formation in the middle of weathering occurred only 1/3 in the strongly weathered around the tunnel shield; the close artificial dig-hole pile on the edge of subway tunnels, the cover load and increasing the stiffness of the beam transformation can bind the vertical and horizontal deformation; the influence of the eccentric soil excavation is much bigger on the horizontal deformation of tunnel structure. Based on the results, the protective measures were proposed to ensure the structural safety and the normal operation of subway tunnels, which provide useful references to the design and construction.
Keywords: deep excavation; shield tunnel; deformation increment; cover load; converted beam; numerical simulation
作者簡(jiǎn)介:秦前波,碩士,工程師,注冊(cè)巖土工程師,Email:qqbren2325@126.com.
 
參考文獻(xiàn)
[1]曾遠(yuǎn),李志高,王毅斌.基坑開挖對(duì)鄰近地鐵車站影響因素研究[J].地下空間與工程學(xué)報(bào), 2005, 4(1): 642-645.
[2]朱正峰,陶學(xué)梅,謝弘帥.基坑施工對(duì)運(yùn)營(yíng)地鐵隧道變形影響及控制研究[J]. 地下空間與工程學(xué)報(bào), 2006, 2(1): 128-131.
[3]高廣運(yùn),高盟,楊成斌,等.基坑施工對(duì)運(yùn)營(yíng)地鐵隧道的變形影響及控制研究[J].巖土工程學(xué)報(bào),2010,32(3): 453-458.
[4]劉庭金. 基坑施工對(duì)盾構(gòu)隧道的影響分析[J].鐵道建筑,2008(2):41-44.
[5]張明遠(yuǎn).基坑施工對(duì)鄰近地鐵隧道變形的影響研究[J].巖土力學(xué),2011,32(3): 453-458.
[6]戴宏偉,陳仁朋,陳云敏.地面新施工荷載對(duì)臨近地鐵隧道縱向變形的影響分析研究[J].巖土工程學(xué)報(bào),2006, 28 (3):213-316.
[7]劉建航,侯學(xué)淵.基坑工程手冊(cè)[M].北京:中國(guó)建筑工業(yè)出版社, 1997.
下載地址

    你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!

    如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!

    如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!