廣州太古匯超長、超深地下室及基礎(chǔ)設(shè)計與施工
高琳,王云丹,周定,傅志良,王文杰
- 摘 要
-
高琳,王云丹,周定,傅志良,王文杰 (廣州市設(shè)計院,廣州 510620)
[摘要]廣州太古匯地下室長283.5m、寬154.35m、深21.5~22.5m。超大超深基坑采用了多種支護形式;地下超長混凝土結(jié)構(gòu)采用后澆帶,并在混凝土中摻加聚丙烯短纖維,以控制混凝土的收縮裂縫;抗浮采用抗拔樁,部分用抗拔錨桿;防水設(shè)計采用“剛?cè)嵯酀⒎琅沤Y(jié)合”的方式,以達到建設(shè)方要求地下室干爽的要求。[關(guān)鍵詞]超大超深基坑;支護形式;抗拔樁;抗拔錨桿;剛?cè)嵯酀环琅沤Y(jié)合中圖分類號:TU473.2,TU753.6文獻標識碼:A文章編號:1002-848X(2012)06-0103-04Design and construction for extra-long and extra-deep basement and its foundation of Guangzhou Taikoo Hui projectGao Lin, Wang Yundan, Zhou Ding, Fu Zhiliang, Wang Wenjie(Guangzhou Design Institute, Guangzhou 510620, China)Abstract: The basement of Guangzhou Taikoo Hui project is 283.5 meters long, 154.35 meters wide and 21.5 to 22.5 meters deep. Many supporting forms are adopted in the extra-big and extra-deep foundation pit. The post-cast strip and concrete with durafiber are used in the extra-long concrete structure design to control concrete shrinkage crack. Uplift piles and uplift boltings are used in anti-floating design. The method of perfect combination of hardness with softness and waterproof with drainage is used in water-proof design in order to achieve the aim of keeping the basement dry and comfortable.Keywords: extra-big and extra-deep foundation pit; supporting form; uplift pile; uplift bolting; hardness with softness and waterproof with drainage作者簡介:高琳,高級工程師, Email:gaolingz@126.com.參考文獻[1]廣州報業(yè)廣場巖土工程勘查報告[R].廣州:廣州市城市規(guī)劃勘測設(shè)計研究院,2001.[2]太古匯廣州報業(yè)廣場基坑工程巖土工程勘查報告[R].廣州:廣州市設(shè)計院,2004.[3]史佩棟,高大釗,桂業(yè)琨.高層建筑基礎(chǔ)工程手冊[M].北京:中國建筑工業(yè)出版社,2000.[4]DBJ 1531—2003建筑地基基礎(chǔ)設(shè)計規(guī)范 [S].北京:中國建筑工業(yè)出版社,2003.[5]GB 50108—2008地下工程防水技術(shù)規(guī)范 [S]. 北京:中國計劃出版社,2009.