- 摘 要
-
(洛陽(yáng)有色金屬加工設(shè)計(jì)研究院 471039)
【提要】 在洛陽(yáng)濕陷性黃土地區(qū)的某高層建筑中,首次采用了CFG長(zhǎng)樁加夯實(shí)水泥土短樁的多樁型復(fù)合地基,根據(jù)地基檢測(cè)結(jié)果分析了其處理濕陷性黃土的效果,提出了該種類(lèi)型復(fù)合地基的設(shè)計(jì)方法、施工處理措施。結(jié)果表明該設(shè)計(jì)方案可縮短工期、降低成本,可供土建設(shè)計(jì)人員參考。
【關(guān)鍵詞】 濕陷性黃土 CFG樁 夯實(shí)水泥土樁 長(zhǎng)短樁
CFG Pile Applied in Collapsible Loess Area/Hou Huakun (Luoyang Design & Research Institute of Nonferrous Metals Processing,Luoyang 471039,China)
Abstract:Long CFG pile and short rammed soilcement pile composite foundation in collapsible loess area is firstly used in a tallbuilding in Luoyang.The effect of ground treatment of collapsible loess by it is analyzed.The designing method and constructional treatment measures are developed.The results show that the composite foundation can save time and cost.The design can be as a reference to structure designers.
Keywords:collapsible loess;CFG pile;rammed soilcement pile;longshortpile composite foundation
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!