- 摘 要
-
【提要】 爛尾樓項目的設(shè)計不同于新建項目的設(shè)計,與既有項目的改造和加固設(shè)計也有區(qū)別。介紹了某爛尾樓項目的改造與加層設(shè)計,涉及到原有樁基礎(chǔ)的利用、下部結(jié)構(gòu)的加固改造、新舊結(jié)合部位的處理和上部加層部分對原鋼構(gòu)件的改造利用等問題,得出一些有用的結(jié)論,希望能引起專家學(xué)者與設(shè)計人員對此類問題足夠的重視。
【關(guān)鍵詞】 爛尾樓 加固 改造 加層
Alteration and Addingstory Design of One Certain Halfbaked Building/Meng Xiande1, Jiang Shengshu2, Yang Weibiao3, Cai Junjian2(1 College of Civil Engineering, Tongji University, Shanghai 200092, China; 2 China Jingye Construction Engineering Contract Company (Shanghai), Shanghai 201206, China; 3 China Institute of Building Standard Design of Research,Beijing 100044,China)
Abstract:The design of the halfbaked building is not only different from that of a new
building, but also different from that of strengthening and alteration. The desi
gn of one halfbaked building is discussed, which includes reuse of the existing piles, strengthening and alteration of the lower structure, the measures of connection between newlybuilt and oldlybuilt, and alteration and reuse of the existing steel member. Some useful results can be deduced,and the intention is to draw more attention of designers and related personnel to such problems.
Keywords:halfbaked building; strengthening; alteration; addingstory
1)同濟大學(xué)土木工程學(xué)院,上海,200092; 2)中國京冶建設(shè)工程承包公司(滬),上海,201206; 3)中國建筑標準設(shè)計研究院,北京,100044。