- 摘 要
-
(1 同濟(jì)大學(xué)地下建筑與工程系 上海 200092;2 西安建筑科技大學(xué)土木工程學(xué)院 710055)
【提要】 因黃土地基濕陷沉降,某建筑物發(fā)生了傾斜沉降,經(jīng)過分析論證,采用靜壓樁托換實(shí)施頂升糾傾方案。設(shè)計(jì)采用400根托換樁,切割部分筏板基礎(chǔ),減小頂升壓力。沿建筑物長度方向分三次一循環(huán)實(shí)施頂升,合理控制了頂升過程的穩(wěn)定問題。該糾偏加固工程實(shí)施順利,效果明顯,解決了地基濕陷的問題,達(dá)到了糾偏的目的,證明了該頂升糾偏工程設(shè)計(jì)的合理性,可以作為同類糾偏加固工程的借鑒。
【關(guān)鍵詞】 頂升糾偏 濕陷性黃土 托換樁
Design of a Sevenstorey Frame Construction Engineering About Jack Lifting and Leaning Rectification/Xiao Tonggang1,Zhao Shude2(1 Department of GeotechenicalEngineering,Tongji Uni
versity,Shanghai 200092,China; 2 College of Civil Engineering,Xi'an University of Architecture and Technology,Xi'an 710055,China)
Abstract:Leaning and settlement appeared in a building for loess foundation settlement. The design method using underpinned pile for jack lifting and leaning rectification is adopted. The design had used four hundred underpinned piles, and a part of buoyant foundation was cut. The jack lifting had three times for a circle, and the stable problem of jack lifting was controlled. The engineering was finished successfully, and it had important reference meaning.
Keywords:jack lifting;leaning rectification;loess soil;underpinned pile