- 摘 要
-
曹曉中
(中石化揚(yáng)子石化設(shè)計(jì)院 南京 210048)[提要] 介紹了揚(yáng)子巴斯夫苯乙烯系列有限公司控制中心樓兩端的控制室和配電間的組合網(wǎng)架設(shè)計(jì)和構(gòu)造措施??刂剖遗c配電間均為大空間結(jié)構(gòu),結(jié)構(gòu)層中還有截面很大的設(shè)備管道穿越,設(shè)計(jì)時(shí)必須承受l0kN/m2的爆作荷載。經(jīng)過(guò)多方案比較,采用螺栓環(huán)節(jié)點(diǎn)組合網(wǎng)架,網(wǎng)架結(jié)構(gòu)高度為1800mm,四邊支承,結(jié)構(gòu)分析采用空間桁架計(jì)算程序。
[關(guān)鍵詞] 組合網(wǎng)架 螺栓環(huán)節(jié)點(diǎn) 瞬時(shí)荷載The design and constructional measures of build-up space grid for the control room and switchboard room located at both ends of a building are generally presented.The control room and switchboard room are both large space structures with equipment pipes of large section disposing in structural floor, which need to bear the action of explosive load l0kN/m2. Therefore, bolt-ringed spherical node build-up space grid, 1 800mm high, supported at four sides, is applied to this building after comparisons of several schemes.
Keywords: build-up space grid; bolt ring node;instantaneous load
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!