- 摘 要
-
(上海建泰預(yù)應(yīng)力工程有限公司 200235)[SX)〗
[提要] 針對(duì)蛋形消化池結(jié)構(gòu)受力的復(fù)雜性、特殊性及結(jié)構(gòu)本身的尺寸限制,提出了沿環(huán)向與子午向配筋和沿45°傾斜方向配筋兩種預(yù)應(yīng)力設(shè)計(jì)方案,通過對(duì)兩種方案的比較,確定了沿環(huán)向與子午向配筋方案,該方案較好地解決了蛋形消化池結(jié)構(gòu)在各種受力工況下的使用要求,能很好地滿足預(yù)應(yīng)力體系對(duì)結(jié)構(gòu)構(gòu)造的要求。
[關(guān)鍵詞] 蛋形消化池 預(yù)應(yīng)力鋼筋 受力分析
Mechanical Analysis of Eggshaped Digester Tanks and Selecting Prestressing Methods/Liu Yaowu,Li Chuanping,Zhang Baohe(Shanghai Giant Prestressing Engineering Corporation Limited,Shanghai 200235,China)
Abstract:Considering eggshaped digester tanks on mechanical complexity and limit of dimensions,two different prestressing methods are presented for laying prestressing tendons on longitude,latitude and 45 degree.Based on the comparison of the two methods,a scheme of laying prestressing tendons is drawn on longitude and latitude.The scheme can satisfy the workability of eggshaped digester tanks on different working conditions and the requirements of construction.
Keywords:eggshaped digester tanks; prestressing tendon; mechanical analysis
- 下載地址
-
你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!