- 摘 要
-
季 韜 (福州大學(xué)土木系 福州 350002)錢在茲 (浙江大學(xué)土木系 杭州 310027)
[提要] 通過對(duì)無粘結(jié)部分預(yù)應(yīng)力扁梁柱節(jié)點(diǎn)外核心區(qū)的受力分析,提出了一種新的節(jié)點(diǎn)外核心區(qū)的設(shè)計(jì)方法,設(shè)計(jì)方法的正確性得到了試驗(yàn)數(shù)據(jù)的證實(shí);通過一個(gè)例題,比較了所提出的設(shè)計(jì)方法與規(guī)范GPJ10-89設(shè)計(jì)方法和其它文獻(xiàn)提出的設(shè)計(jì)方法,結(jié)果表明,作者提出的設(shè)計(jì)方法概念明確,計(jì)算簡(jiǎn)單,考慮因素全面,可供工程設(shè)計(jì)參考使用。
[關(guān)鍵詞] 扁梁柱節(jié)點(diǎn) 無粘結(jié)部分預(yù)應(yīng)力 外核心區(qū)Based on the analysis of outside core of unbonded partially prestressed flat beam-column joints, this paper proposes a new designed method for such kind of joint core,which is verified by test data. The advantages and disadvantages of the methods of GBJ10-89 code and other references are discussed. The conclusion is drawn that the method proposed by the author has clear concept and the calculation process is simple. All affecting factors are considered in the method. This method can be used in engineering design.
Keywords: flat beam-column joints; unbonded partially prestressed; outside core
- 下載地址
-
你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!