884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2003年>> 第08期>>正文內(nèi)容
人工挖孔灌注樁靜載試驗(yàn)有關(guān)問題的探討
余 旭
摘 要

    余  旭      (安徽建筑工業(yè)學(xué)院  合肥 230022)

[提要]  根據(jù)人工挖孔灌注樁的靜載試驗(yàn)結(jié)果,分析了人工挖孔灌注樁的承載狀態(tài)和受力機(jī)理。就人工挖孔灌注樁的試驗(yàn)方法、結(jié)構(gòu)設(shè)計(jì)中有關(guān)問題進(jìn)行了探討,提出了一些建議供工程中參考。
[關(guān)鍵詞]  人工挖孔灌注樁  靜載試驗(yàn)  樁側(cè)摩阻力  端阻力  沉降

According to the field test results of static load experiment of the manual bore cast-in-place pile, the author analyses the mechanism of load transferring and the characteristic of bearing capacity of the pile. The method of static load experiment of the manual bore cast-in-place pile and some interrelated problems in the structural design are discussed. Some suggestions are provided,which may be taken as the reference in the engineering.
Keywords: manual bore cast-in-place pile; static load experiment; frictional resistance; end bearing; settlement

下載地址

    你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!

    如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!

    如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!