- 摘 要
-
趙挺生 (清華大學(xué)土木系 北京 100084)顧祥林 張 譽(yù) (同濟(jì)大學(xué)建筑工程系 上海 200092)
[提要] 針對(duì)梁板柱混凝土結(jié)構(gòu)施工階段承擔(dān)的施工荷載,提出按梁、板兩個(gè)時(shí)變結(jié)構(gòu),分別計(jì)算作用于梁、板以及梁與板上支架的施工荷載,通過(guò)支架承擔(dān)施工荷載的線(xiàn)性疊加計(jì)算梁和板共用支架承擔(dān)施工荷載的簡(jiǎn)化模型,經(jīng)實(shí)際工程驗(yàn)證,該模型可為施工人員進(jìn)行模板支撐系統(tǒng)設(shè)計(jì)與安全檢驗(yàn)提供依據(jù)。
[關(guān)鍵詞] 混凝土結(jié)構(gòu) 施工階段 時(shí)變結(jié)構(gòu)體系 施工荷載 安全檢驗(yàn)Through simulating the beam-slab-column structures during construction as two time-dependent structures, namely time-dependent beam and slab structure,loads on the slab, beam and shores are calculated respectively, and the load on the common shore of beam and slab is added linearly. Then a simplified method for beam-slab-column structural construction loads analysis is put forward, and verified with the results of testing in-site, which is the base for the design of construction schedule and checking of temporary structures.
Keywords: beam-slab-column concrete structure; construction process; time-dependent system; loads; safety
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!