- 摘 要
-
單玉川 應義淼 (浙江工業(yè)大學建筑設(shè)計研究院 杭州 310014)
[提要] 在工程設(shè)計實踐中,長樁持力層下面常遇到軟弱下臥層,為了保證所設(shè)計的長樁安全有效,關(guān)鍵是軟弱下臥層土的沉降量的計算,而按規(guī)范JGJ94-94方法計算往往偏大。采用文中根據(jù)多年工程實踐提出的沉降計算方法進行沉降計算,結(jié)果與實際沉降較吻合,較好地解決了此類問題。
[關(guān)鍵詞] 長樁 軟土下臥層 地基沉降In engineering design practice, the undersurface of load bearing layer loaded by the long pile often meets with soft soil underlayer. For the purpose of long pile designed to be secure and effective, the settlement calculation of soft soil underlayer is key factor. But it is much large calculated with JGJ94-94 code.The settlement calculaion method presented based on engineering practice of many years is tallied with practiced settlement, and solves analogic questions well.
Keywords: long pile; soft soil underlayer; foundation settlement