- 摘 要
-
李鎮(zhèn)強(qiáng) Rigoberto Ramirez C.
( CONHSA GROUP HONDURAS)[提要] 在1940年代,美國(guó)德克札高( TEXACO)石油公司在洪都拉斯國(guó)北方海岸建有一個(gè)鋼結(jié)構(gòu)的原油碼頭。1998年德克札高公司在原來(lái)的舊址重建新碼頭和岸邊的引橋。新原油碼頭工程采用預(yù)制預(yù)應(yīng)力混凝土樁基礎(chǔ)。上部結(jié)構(gòu)采用預(yù)制和現(xiàn)澆混凝土疊合結(jié)構(gòu)。施工中基本免除了現(xiàn)場(chǎng)的模板工程作業(yè),大大提高了工程質(zhì)量,縮短了施工周期。介紹這一設(shè)計(jì)的特色及施工和安裝中的要點(diǎn),其創(chuàng)新設(shè)計(jì)觀念給碼頭工程和海工結(jié)構(gòu)的傳統(tǒng)設(shè)計(jì)提供了新的思路。
[關(guān)鍵詞] 預(yù)制 現(xiàn)澆 裝配 碼頭 樁 疊合結(jié)構(gòu)The Texaco Whart maritime Port Facility is a major marine docking structure located off the northern coast of Honduras that has replaced a 1940's steel frame docking structure and access bridge. The structure comprises precast concrete piling and superstructure components that combine precast and cast-in-place concrete. The construction methodology almost completely eliminated the need for on site formwork and proved to be very successful in producing a high quality docking project in a short time frame. This article presents the design parameters, construction challenges, and erection highlights of the project.
Keywords: precast concrete; cast-in-place concrete; docking project; pile
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!