- 摘 要
-
1)大連理工大學(xué)土木水利學(xué)院,116024;2)鄭州經(jīng)濟(jì)開(kāi)發(fā)區(qū)質(zhì)量監(jiān)督站,450000;3)鄭州大學(xué)土木工程學(xué)院,450002。
【提要】 通過(guò)某化工廠服役20年食鹽電解車間鋼筋混凝土工業(yè)廠房的現(xiàn)場(chǎng)測(cè)試和構(gòu)件受力性能的試驗(yàn)研究,對(duì)受腐蝕鋼筋混凝土構(gòu)件及結(jié)構(gòu)的可靠度做出了合理的評(píng)價(jià),提出不停產(chǎn)、無(wú)明火條件下結(jié)構(gòu)的維修加固方案。加固后8年結(jié)構(gòu)運(yùn)行較好,驗(yàn)證了該加固方案的有效性。
【關(guān)鍵詞】 氯離子 腐蝕 鋼筋混凝土 加固
Maintenance and Strengthening of Corroded RC Workshops of Chemical Plant/Fan Yingfang1,Zhou Jing2,Huang Bin2,Huang Zhenguo3(1 School of Civil & Hydraulic Eng.,Dalian Univ.of Tech.,Dalian 116024,China;2 Quality Supervising Station of Zhengzhou Economic Development District,Zhengzhou 450000,China;3 School of Civil Eng.,Zhengzhou University,Zhengzhou 450002,China)
Abstract:Field measurements are executed on RC structure of a salt electrolytic plant which has been in service for 20 years.Laboratory experiments on mechanical properties of the corroded RC members are carried out as well.Based on the field test and laboratory experiments,rational safety evaluation is achieved.Retrofitting plan is designed.During the past 8 years,the strengthened structure works well all along,which proves that the retrofitting plan is effective.
Keywords:chloride; corrosion; reinforced concrete; retrofitting
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!