(中國建筑設(shè)計研究院,北京100044)[摘要] 工程由5座高層建筑及圍合在中間的純地下車庫組成,介紹了基礎(chǔ)設(shè)計中為減少差異沉降采取的主要措施、結(jié)構(gòu)方案優(yōu)化設(shè)計方面所做的計算分析和比較,以及預(yù)應(yīng)力技術(shù)在上部大跨度轉(zhuǎn)換結(jié)構(gòu)和連體結(jié)構(gòu)中的應(yīng)用,可為同類工程設(shè)計提供參考。
[關(guān)鍵詞] 差異沉降;后澆帶;轉(zhuǎn)換層;預(yù)應(yīng)力Structural design of Bejing Jiarunyuan international community
Xu Lin, Jia Wenying, Zhang Jianyu, Zhang Shitong
( China Architecture Design & Research Group, Beijing 100044, China )Abstract: The project consists of several tall buildings surrounding an underground garage. Measures to reduce the settlement difference in the foundation, structure-type selection and optimized design, application of prestressed concrete in the long span tranqer structure system and connected double- structure system are discussed. These may be referred in the similar projects design.
Keywords: settlement difference; post-casted zone; transfer story; prestressed concrete