- 摘 要
-
1) 北京市建筑設(shè)計(jì)研究院,北京,100045;2)中外建工程設(shè)計(jì)與顧問(wèn)有限公司,北京,100044;3)中國(guó)新興建設(shè)開(kāi)發(fā)公司,北京,100039。
[提要] 中高層配筋混凝土小型空心砌塊剪力墻結(jié)構(gòu)在我國(guó)還是一種新的結(jié)構(gòu)形式,具有節(jié)約鋼材、節(jié)省模板、降低綜合造價(jià)等優(yōu)點(diǎn)。但在結(jié)構(gòu)設(shè)計(jì)計(jì)算以及施工方面還缺乏經(jīng)驗(yàn),相應(yīng)的技術(shù)也不夠配套。為在高烈度區(qū)建造和推廣此類(lèi)結(jié)構(gòu),通過(guò)在8度區(qū)建造30m高10 5層的試點(diǎn)工程,籍以總結(jié)設(shè)計(jì)、施工經(jīng)驗(yàn),供借鑒。
[關(guān)鍵詞] 配筋混凝土砌塊 暗構(gòu)造柱 芯柱 大開(kāi)間
Design and Construction of Shear\|wall Structure of Small Concrete Hollow Blocks with Reinforcing bars for Middle\|height and High\|rise Buildings/Zhou Bingzhang1), Pan Longyi2), Shi Feng3)(1.Beijing Institute of Achitectural Design,Beijing 100045, China; 2.CCI Engineering Design & Consulting CO, Beijing 100044,China; 3. China Xinxing Construction Development General Company,Beijing 100039,China)
Abstract:The shearwall structure of small concrete hollow blocks with reinforcing bars for middleheight and highrise buildings is a new type one in China, which has the advantages of saving steel, saving formwork and lower cost. However, the experience for calculation of structure design and construction is no sufficient now, and the relative techniques are not prepared. To develop the structure in the area of high seismic intensity, we built a 30m high pilot building in area of seismic intensity 8 with 10 and half floors for getting the experience of design and construction.
Keywords:reinforced concrete blocks; concealed structural column; core column; big bay
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!