884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2006年>> 第06期>>正文內(nèi)容
鋼-混凝土組合樓板施工階段變形計算荷載取值探討
侯光瑜
摘 要

(北京市建筑設(shè)計研究院 北京 100045)
[提要] 現(xiàn)場測試和模擬試驗表明,壓型鋼板作為組合樓板澆注混凝土的底模,在施工荷載撤走后,壓型鋼板的變形出現(xiàn)回彈,實測撓度與樓板自重作用下的計算撓度基本吻合,小于按現(xiàn)行標準計算的結(jié)果。因此,驗算組合樓板施工階段的撓度時,可不考慮施工荷載的影響。
[關(guān)鍵詞] 組合樓板 壓型鋼板 現(xiàn)場實測 模擬試驗 變形回彈施工荷載
Discuss on Loading Condition in Deflection Calculation of Composite Slab with Metal Deck at the Construction Stage/Hou Guangyu(Beijing Institute of Architectural Design,Beijing 100045,China)
Abstract:In order to verify the loading condition in the deflection calculation of composite slab with metal deck during construction,the site test and a simulation experiment were carried out.Both the measured metal\|deck deflections of the site test and constructional simulation experiment of a full scale continuous composite slab at the construction stage show that the construction live load should not be included in the deflection calculation,as the deck is designed to be in elastic range, so the deflection of the metal deck should rebound after removal of construction live load,and the measured deflections are extremely close to those which are calculated by the weight of wet concrete and metal deck.
Keywords:composite slab; metal deck; site test; simulation experiment; rebound of deflection; construction live load

下載地址

    你還沒注冊?或者沒有登錄?這篇論文要求至少是本站的注冊會員才能閱讀!

    如果你還沒注冊,請趕緊點此注冊吧!

    如果你已經(jīng)注冊但還沒登錄,請趕緊點此登錄吧!