- 摘 要
-
(中國(guó)建筑設(shè)計(jì)研究院 北京 100044)
【提要】 唐山市國(guó)際會(huì)展中心展廳采用混凝土巨型框架結(jié)構(gòu)體系,巨型柱為現(xiàn)澆鋼筋混凝土框架形成的筒體,大跨度梁采用現(xiàn)澆混凝土箱形截面。采用后張預(yù)應(yīng)力技術(shù),結(jié)合后澆帶設(shè)置與預(yù)應(yīng)力筋連接器,實(shí)現(xiàn)了雙向大跨度結(jié)構(gòu)、超長(zhǎng)預(yù)應(yīng)力筋的分段多次張拉。在設(shè)計(jì)中還提出了確定超長(zhǎng)混凝土樓板在施工階段和使用階段中的應(yīng)力與預(yù)應(yīng)力值的數(shù)值計(jì)算方法。
【關(guān)鍵詞】 巨型框架 大跨度 超長(zhǎng)結(jié)構(gòu) 預(yù)應(yīng)力 混凝土收縮應(yīng)力
Superlength Largespan Prestressed RC Structure of Tangshan International Convention & Exhibition Center/Fan Zhong, Wang Daqing, Tang Jie, You Tianzhi, Bi Lei, Wang Chunguang(China Architecture Design & Research Group, Beijing 100044,China)
Abstract:The megaframe concrete structural system is adopted for the main exhibition hall of Tangshan International Convention & Exhibition Center. The huge columns consist of casein site RC frametube and the largespan beams are made by RC boxsections. Using post tension technique and combining postcast band and prestressed tendon connectors, multisection tension is realized for the twoway large span RC structure. Numerical method for calculating stress and prestressed for superlength RC slabs in both construction and usage is also presented.
Keywords:megaframe;largespan; superlength structure;pre-stressed; shrinkage
- 下載地址
-
你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!
如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!
如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!