您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2022年>> 第01期>>正文內(nèi)容
上海圖書館東館懸掛結(jié)構(gòu)方案設(shè)計(jì)與研究
肖 魁1,2, 賈水鐘1, 賈君玉3,4, 郭小農(nóng)5
摘 要

(1 上海建筑設(shè)計(jì)研究院有限公司, 上海 200041;2 上海天華建筑設(shè)計(jì)有限公司, 上海 200235;3 上海城建職業(yè)學(xué)院數(shù)字建造學(xué)院, 上海 200438;4 浙江精工鋼結(jié)構(gòu)集團(tuán)有限公司, 紹興 312030;5 同濟(jì)大學(xué)建筑工程系, 上海 200092)

摘要: 上海圖書館東館屬于上海市重大工程,建筑設(shè)計(jì)以高大空間為主,結(jié)構(gòu)具有大跨度、大懸掛、大開洞的特點(diǎn)。 建筑主要柱網(wǎng)尺寸為 16. 8m×16. 8m,結(jié)構(gòu)四周的大跨外挑區(qū)域采用“多層懸掛結(jié)構(gòu)”,在屋頂設(shè)置雙向上翻鋼桁架,通過桁架端部的吊柱來傳遞下方 5 層懸掛區(qū)的荷載。 吊柱采用高強(qiáng)鋼拉桿,拉桿長度可調(diào)節(jié)以適應(yīng)施工誤差。 設(shè)計(jì)時(shí)需考慮懸掛結(jié)構(gòu)的施工順序、防連續(xù)倒塌、節(jié)點(diǎn)構(gòu)造等問題,針對上述設(shè)計(jì)難點(diǎn)開展了專項(xiàng)計(jì)算分析、試驗(yàn)研究、健康監(jiān)測等。

關(guān)鍵詞: 上海圖書館東館;懸掛結(jié)構(gòu);高強(qiáng)鋼拉桿;節(jié)點(diǎn)設(shè)計(jì);施工順序

中圖分類號:TU318,TU393. 3 文獻(xiàn)標(biāo)志碼:A 文章編號:1002 ̄848X(2022)01 ̄0001 ̄06

DOI:10. 19701 / j. jzjg. 20200521

Design and research on suspended structure scheme of Shanghai East Library

XIAO Kui1,2, JIA Shuizhong1, JIA Junyu3,4, GUO Xiaonong5

(1 Shanghai Institute of Architectural Design and Research Co., Ltd., Shanghai 200041, China;2 Shanghai TianhuaArchitectural Design Co., Ltd., Shanghai 200235, China;3 School of Digital Construction, Shanghai Urban ConstructionVocational College, Shanghai 200438, China;4 Zhejiang Jinggong Steel Building Group Co., Ltd., Shaoxing 312030, China;5 Department of Structural Engineering, Tongji University, Shanghai 200092, China)

Abstract: Shanghai East Library is a major project in Shanghai. The architectural design is mainly based on tall and largespace and the structure has the characteristics of large span, large suspension, and large openings. The main column gridsize of the building is 16. 8m×16. 8m. The large ̄span cantilever area around the structure adopts a " multi ̄layer suspendedstructure" . A two ̄way upturned steel truss is installed on the roof, and the load in the cantilever zone of the lower fivestories is transferred by the suspension columns at the end of the truss. The suspension columns are made of high ̄strengthsteel rods, and the length of the rod can be adjusted to meet the construction error. In the design, the constructionsequence, anti ̄progressive collapse, and joint construction of the suspended structure should be considered. Specialcalculation and analysis, experimental research, and health monitoring were carried out for the above design difficulties.

Keywords:Shanghai East Library;suspended structure;high ̄strength steel rod;joint design;construction sequence

第一作者:肖魁,博士,高級工程師,主要從事數(shù)字化設(shè)計(jì)和空間結(jié)構(gòu)設(shè)計(jì),Email:xiaokui87@ 126. com。

[引用本文] 肖魁,賈水鐘,賈君玉,等. 上海圖書館東館懸掛結(jié)構(gòu)方案設(shè)計(jì)與研究[ J]. 建筑結(jié)構(gòu),2022,52(1):1 ̄6. XIAO Kui,JIA Shuizhong,JIA Junyu,et al. Design and research on suspended structure scheme of Shanghai EastLibrary[J]. Building Structure,2022,52(1):1 ̄6.

下載地址

    你還沒注冊?或者沒有登錄?這篇論文要求至少是本站的注冊會員才能閱讀!