- 摘 要
-
(1 北京建工集團有限責(zé)任公司, 北京 100055; 2 河北省土木工程災(zāi)變控制與災(zāi)害應(yīng)急重點實驗室, 廊坊 065201; 3 華北科技學(xué)院建筑工程學(xué)院, 廊坊 065201)
摘要: 北京工人體育場工程因基坑占地面積大、工期緊,物資完全依賴塔吊不滿足進度要求,設(shè)計了一道鋼棧橋供運輸及施工車輛行駛,便于材料運輸及施工,加快施工速度. 介紹了鋼棧橋整體安裝過程,采用 MIDAS Gen 軟件對安裝過程進行有限元模擬,驗證了鋼棧橋的安全性;建立健康監(jiān)測系統(tǒng)進行荷載試驗監(jiān)測,確保鋼棧橋運營期間的可靠性. 結(jié)果表明,鋼棧橋在安裝過程和運營期間安全、可靠,能有效抵御車輛的往復(fù)荷載.
關(guān)鍵詞: 北京工人體育場; 鋼棧橋; 荷載試驗; 有限元模擬; 大高差; 重荷載
中圖分類號:TU399 文獻(xiàn)標(biāo)志碼:A 文章編號:1002-848X(2023)06-0071-05
DOI:10. 19701 / j. jzjg. ZJ220115
Design and monitoring of steel trestle for construction of Beijing Workers Stadium
HUANG Zhongying1, WANG Meng1, LIU Cong2,3, WANG Yisen1
(1 Beijing Construction Engineering Group Co. , Ltd. , Beijing 100055, China; 2 Hebei Key Laboratory of CivilEngineering Catastrophe Control and Disaster Emergency Response, Langfang 065201, China; 3 Architectural EngineeringCollege, North China Institute of Science and Technology, Langfang 065201, China)
Abstract: Beijing Workers Stadium project because of the large area foundation pit and tight construction period, relying onthe tower crane for materials completely does not meet the schedule requirements. A steel trestle was designed fortransportation and construction vehicles, which was convenient for material transportation and construction and speeded upconstruction speed. The whole installation process of steel trestle was introduced. The finite element simulation of theinstallation process was carried out by MIDAS Gen software to ensure the safety of steel trestle. The health monitoringsystem of steel trestle was established to carry out load test and ensure the reliability of trestle project in service period. Theresults show that the steel trestle is safe and reliable in the installation process and service period, the steel trestle caneffectively resist the reciprocating load of vehicles.
Keywords:Beijing Workers Stadium; steel trestle; load test; finite element simulation; large height difference; heavy load
∗河北省省級科技計劃資助(22375410D).
第一作者:黃中營,學(xué)士,高級工程師,主要從事土建施工等方面研究,Email:157266903@ qq. com.
[引用本文] 黃中營,王猛,劉聰,等. 北京工人體育場施工用鋼棧橋設(shè)計與監(jiān)測[ J]. 建筑結(jié)構(gòu),2023,53(6):71-75,25. HUANG Zhongying,WANG Meng,LIU Cong,et al. Design and monitoring of steel trestle for construction of BeijingWorkers Stadium[J]. Building Structure,2023,53(6):71-75,25.