884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2023年>> 第11期>>正文內(nèi)容
杭州“星創(chuàng)城”商業(yè)綜合體結(jié)構(gòu)設(shè)計要點與分析
劉 勇, 張 媛, 樓澤楊, 劉榮達(dá), 朱 力
摘 要

(浙江省省直建筑設(shè)計院有限公司, 杭州 310030)

摘要: 杭州“星創(chuàng)城”商業(yè)綜合體建筑高度 30. 8m、長 300m,為大型復(fù)雜高層鋼筋混凝土框架結(jié)構(gòu). 為了實現(xiàn)結(jié)構(gòu)預(yù)定的設(shè)計性能目標(biāo),首先從概念上通過設(shè)縫解決復(fù)雜結(jié)構(gòu)的平立面規(guī)則性問題,再運(yùn)用 YJK 和 MIDAS Gen 對主體結(jié)構(gòu)進(jìn)行了多遇地震彈性計算及時程分析、設(shè)防烈度地震性能設(shè)計以及罕遇地震彈塑性時程分析,此外,對開大洞樓板進(jìn)行了中震計算,對超長樓板溫度應(yīng)力進(jìn)行了補(bǔ)充計算,最后對下穿地鐵線的地下室抗壓、抗浮以及通過樁基與天然基礎(chǔ)協(xié)同工作來減小變形差的問題進(jìn)行了計算分析. 通過上述幾個步驟的計算分析并對關(guān)鍵構(gòu)件及重要部位采取了加強(qiáng)結(jié)構(gòu)外圈剛度、大懸挑梁根部設(shè)置構(gòu)造性型鋼、樓板應(yīng)力集中處進(jìn)行加強(qiáng)及底板預(yù)留后注漿孔等有針對性的加強(qiáng)措施,本結(jié)構(gòu)達(dá)到了預(yù)定的設(shè)計性能目標(biāo).

關(guān)鍵詞: 高層結(jié)構(gòu); 抗震性能化; 超限判斷; 樓板開洞; 彈性時程分析; 溫度應(yīng)力; 地鐵上蓋

中圖分類號:TU375. 4 文獻(xiàn)標(biāo)志碼:A 文章編號:1002-848X(2023)11-0041-07

DOI:10. 19701 / j. jzjg. LS220131

Key points and analysis of structural design of “Xing Chuang City”shopping mall in Hangzhou

LIU Yong, ZHANG Yuan, LOU Zeyang, LIU Rongda, ZHU Li

(Zhejiang Provincial Direct Architectural Design Institute, Hangzhou 310030, China)

Abstract:“Xing Chuang City”shopping mall in Hangzhou has a building height of 30. 8m and a length of 300m. It is a largecomplex high-rise reinforced concrete frame structure. In order to achieve the predetermined design performance goal of thestructure, firstly,the problem of the regularity of the plane elevation was solved conceptually by joint setting. Then, by usingYJK and MIDAS Gen, the elastic calculation and time-history analysis of the main structure under frequent earthquake,seismic performance design of fortification intensity and elastic-plastic time-history analysis under rare earthquake werecarried out. In addition, the mid-earthquake calculation was carried out for the large opening slab, and the supplementarycalculation was made for the temperature stress of the super-long slab. And finally, the problems of anti-pressure,anti-floating of the basement under the subway line and the problem that the pile foundation and natural foundation worktogether to reduce the deformation difference was analyzed. Through the calculation and analysis of the above-mentionedsteps and taking targeted strengthening measures for the key components and important parts, such as increasing thestiffness of the outer ring structure, using structural steel at the root of large cantilever beams, strengthening stressconcentration points on the floor slabs, and providing grouting holes in the bottom plate,the structure has achieved thepredetermined design performance goal.

Keywords: high-rise structure; performance-based seismic; transfinite judgment; floor opening; elastic time historyanalysis; temperature stress; subway roof

第一作者:劉勇,碩士,高級工程師,一級注冊結(jié)構(gòu)工程師,主要從事大型復(fù)雜結(jié)構(gòu)設(shè)計,Email: 335307314@ qq. com.

[引用本文] 劉勇,張媛,樓澤楊,等. 杭州“星創(chuàng)城” 商業(yè)綜合體結(jié)構(gòu)設(shè)計要點與分析[ J]. 建筑結(jié)構(gòu),2023,53(11):41-47,87. LIU Yong,ZHANG Yuan,LOU Zeyang,et al. Key points and analysis of structural design of “ XingChuang City”shopping mall in Hangzhou[J]. Building Structure,2023,53(11):41-47,

下載地址

    你還沒注冊?或者沒有登錄?這篇論文要求至少是本站的注冊會員才能閱讀!

    如果你還沒注冊,請趕緊點此注冊吧!

    如果你已經(jīng)注冊但還沒登錄,請趕緊點此登錄吧!