884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2021年>> 第21期>>正文內(nèi)容
洛陽隋唐城應(yīng)天門遺址保護(hù)建筑基礎(chǔ)拉桿設(shè)計(jì)
徐珂1,姬浩杰2,梁巖3
摘 要

(1 清華大學(xué)建筑設(shè)計(jì)研究院有限公司, 北京 100084;2 河南六建建筑集團(tuán)有限公司, 洛陽 471001;3 鄭州大學(xué)土木工程學(xué)院, 鄭州 450001) 

[摘要]隋唐城應(yīng)天門遺址保護(hù)建筑采用樁基礎(chǔ),樁頂設(shè)置承臺(tái)支撐上部斜柱框架。在不能開挖遺址的情況下,采用暗挖頂管工藝施工基礎(chǔ)預(yù)應(yīng)力拉桿,平衡基礎(chǔ)間水平推力。先后介紹了預(yù)應(yīng)力拉桿的組成、預(yù)應(yīng)力張拉次數(shù)、預(yù)應(yīng)力張拉比例和順序、樁頂水平位移控制目標(biāo)等設(shè)計(jì)原則,以及預(yù)應(yīng)力拉桿的施工方案及施工控制方法,并根據(jù)施工監(jiān)測(cè)結(jié)果及施工模擬結(jié)果對(duì)施工方案進(jìn)行了調(diào)整。結(jié)果表明:施工過程中樁頂水平位移均滿足既定目標(biāo),且變化趨勢(shì)與施工模擬結(jié)果吻合。 

[關(guān)鍵詞]洛陽隋唐城應(yīng)天門遺址;遺址保護(hù);暗挖頂管;預(yù)應(yīng)力拉桿;施工監(jiān)測(cè) 

中圖分類號(hào):TU318 文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):1002-848X(2021)21-0129-07

 

Foundation tie rod design of the conservation building of YingTianMen archaeological site of Luoyang City of Sui and Tang Dynasties 

XU  Ke1,  JI  Haojie2,  LIANG  Yan3 

(1 Architectural Design & Research Institute of Tsinghua University Co., Ltd., Beijing 100084, China;2 Henan Six Construction Group, Luoyang 471001, China;3 School of Civil Engineering, Zhengzhou University, Zhengzhou 450001, China) 

Abstract: Pile foundation was used in the conservation building of YingTianMen archaeological site of Luoyang City of Sui and Tang Dynasties. The pile cap was set to support the upper inclined column frame. As the site could not be excavated, the prestressed tie rod between foundations was constructed by underground excavation and pipe jacking technology to balance the horizontal thrust between foundations. The composition of the prestressed tie rod were introduced, the number of prestressed tension, the proportion and sequence of prestressed tension, the horizontal displacement control target of pile top and other design principles were introduced successively, as well as the construction scheme and construction control method of the prestressed tie rod were introduced. According to the comparison of construction monitoring and construction simulation results, the construction scheme was adjusted. The results show that the horizontal displacement of pile top meets the established target during construction, and the variation trend is consistent with the construction simulation results. 

Keywords:YingTianMen archaeological site of Luoyang City of Sui and Tang Dynasty; archaeological site protection; underground excavation and pipe jacking; prestressed tie rod; construction monitoring

 

作者簡介:徐珂,碩士,教授級(jí)高級(jí)工程師,一級(jí)注冊(cè)結(jié)構(gòu)工程師,Email:15601060166@126.com。

下載地址

    你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!

    如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!

    如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!