884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2021年>> 第18期>>正文內(nèi)容
裝配式鋼筋混凝土剪力墻基礎(chǔ)隔震結(jié)構(gòu)受力性能試驗(yàn)研究*
耿攀1,程蓓1,2,雷遠(yuǎn)德3
摘 要

(1 北京建筑大學(xué)土木與交通工程學(xué)院, 北京 100044;2 北京未來城市設(shè)計高精尖創(chuàng)新中心, 北京 100044;3 中國建筑標(biāo)準(zhǔn)設(shè)計研究院有限公司, 北京 100048)

[摘要]為深入研究采用套筒漿錨連接的裝配式鋼筋混凝土剪力墻基礎(chǔ)隔震結(jié)構(gòu)的受力性能,設(shè)計了3個1/4縮尺三層現(xiàn)澆混凝土剪力墻結(jié)構(gòu)、套筒漿錨連接裝配式混凝土剪力墻結(jié)構(gòu)與套筒漿錨連接裝配式混凝土剪力墻隔震結(jié)構(gòu)試件。通過低周反復(fù)水平荷載試驗(yàn)探究了3個試件不同的裂縫開展規(guī)律、塑性發(fā)展次序、破壞形態(tài)、滯回曲線、耗能能力以及隔震支座變形特性等受力性能。試驗(yàn)結(jié)果表明:套筒漿錨連接裝配式混凝土剪力墻基礎(chǔ)隔震結(jié)構(gòu)可以有效地避免上部裝配式混凝土剪力墻結(jié)構(gòu)在接縫處出現(xiàn)剪切滑移破壞,并具有優(yōu)越的耗能能力。

[關(guān)鍵詞]預(yù)制裝配式剪力墻;套筒漿錨連接;基礎(chǔ)隔震;低周反復(fù)水平荷載試驗(yàn) 

中圖分類號:TU375 文獻(xiàn)標(biāo)識碼:A文章編號:1002-848X(2021)18-0098-08

 

Experimental research on the mechanical performance of precast reinforced concrete shear wall base isolation structure 

GENG  Pan1,  CHENG  Bei1,2,  LEI  Yuande3 

(1 School of Civil and Transportation Engineering, Beijing University of Civil Engineering and Architecture, Beijing100044, China;2 Beijing Advanced Innovation Center for Future Urban Design, Beijing 100044, China;3 China Institute of Building Standard Design and Research, Beijing 100048, China) 

Abstract: For an in-depth research on the mechanical performance of the precast reinforced concrete shear wall base isolation structure  via grout sleeve splicing, three 1/4 scaled-down three-storey structural models were designed respectively, including a  integrated cast-in-situ shear wall structure, a precast concrete shear wall structure with grouted sleeve connections,and a based-isolated precast concrete shear wall structure with grouted sleeve connections. By conducting low-cycle repeated horizontal load tests, the crack development law, the plastic development sequence, the failure pattern,  hysteresis curve, energy dissipation, deformation of the isolation bearing and other mechanical performance parameters of the three scaled-down samples were studied. The experimental results show that the precast concrete shear wall base isolation structure  via grout sleeve splicing can effectively avoid the shear slip failure of the upper precast concrete shear wall structure at the joints and has the superior energy consumption capacity. 

Keywords:precast shear wall; grout sleeve splicing; base isolation; low-cycle repeated horizontal load test

 

*國家重點(diǎn)研發(fā)計劃資助(2017YFC0703600),北京市自然科學(xué)面上基金項目(8162014)。

 

 作者簡介:耿攀,碩士,Email: 869456921@qq.com; 通信作者:程蓓,博士,副教授,Email:chengbei@bucea.edu.cn。

下載地址

    你還沒注冊?或者沒有登錄?這篇論文要求至少是本站的注冊會員才能閱讀!

    如果你還沒注冊,請趕緊點(diǎn)此注冊吧!

    如果你已經(jīng)注冊但還沒登錄,請趕緊點(diǎn)此登錄吧!