884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2021年>> 第05期>>正文內(nèi)容
裝配式鋼-混凝土組合結(jié)構(gòu)抗剪性能試驗(yàn)研究
孫艷寧1,李樹忱1,孫國富2,王修偉1,王九公1
摘 要

(1 山東大學(xué)齊魯交通學(xué)院巖土工程系, 濟(jì)南 250061; 2 山東交通學(xué)院交通土建工程學(xué)院, 濟(jì)南 250061)

[摘要]為研究一種新型的預(yù)制混凝土板與型鋼組合的裝配式鋼-混凝土組合結(jié)構(gòu)的抗剪性能,開展了4組12個(gè)試件(3個(gè)整體式現(xiàn)澆鋼-混凝土組合結(jié)構(gòu)試件,9個(gè)裝配式鋼-混凝土組合結(jié)構(gòu)試件)的推出試驗(yàn),分析了該組合結(jié)構(gòu)的破壞形態(tài)、荷載-滑移曲線及極限受剪承載力。結(jié)果表明,整體式現(xiàn)澆鋼-混凝土組合結(jié)構(gòu)試件的破壞形態(tài)為栓釘剪斷;而裝配式鋼-混凝土組合結(jié)構(gòu)試件表現(xiàn)為局部的栓釘剪斷和混凝土剪切破壞,裝配式現(xiàn)澆鋼-混凝土組合結(jié)構(gòu)試件極限滑移較整體式現(xiàn)澆鋼-混凝土組合結(jié)構(gòu)試件增加1倍,延性得到明顯改善;裝配式鋼-混凝土組合結(jié)構(gòu)試件極限受剪承載力約為整體式現(xiàn)澆鋼-混凝土組合結(jié)構(gòu)試件的80%,并滿足規(guī)范要求;新舊混凝土結(jié)合面進(jìn)行粗糙處理后,裝配式鋼-混凝土組合結(jié)構(gòu)試件極限受剪承載力提高5%,抗剪鋼筋直徑由14mm增加為20mm時(shí),裝配式鋼-混組合結(jié)構(gòu)試件極限受剪承載力提高10%。

[關(guān)鍵詞]鋼-混凝土組合結(jié)構(gòu);裝配式結(jié)構(gòu);推出試驗(yàn);荷載-滑移曲線;極限受剪承載力

中圖分類號(hào):TU398-9文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):1002-848X(2021)05-0061-06

 

Experimental study on shear performance of assembled steel-concrete composite structures

SUN Yanning1, LI Shuchen1, SUN Guofu2, WANG Xiuwei1, WANG Jiugong1

(1 Department of Geotechnical Engineering, School of Qilu Transportation, Shandong University, Jinan 250061, China; 2 School of Traffic Civil Engineering, Shandong Jiaotong University, Jinan 250061, China)

Abstract:In order to study on shear performance of a new type assembled steel-concrete composite structures which consists of precast concrete slab and formed steel, the push-out tests of 4 groups of 12 specimens (3 integral cast-in-situ steel-concrete composite structure specimens, 9 assembled steel-concrete composite structure specimens) were carried out. The failure mode, load-slip curve and ultimate shear capacity of the composite structure were analyzed. The results show that the failure mode of the integral cast-in-situ steel-concrete composite structure specimen is stud shear; while the assembled steel-concrete composite structure specimen shows local stud shear and concrete shear failure. Compared with the integral cast-in-situ steel-concrete composite structure specimen, the ultimate slip of assembled steel-concrete composite structure specimen is doubled and its ductility is significantly improved. The ultimate shear capacity of assembled steel-concrete composite structure specimen can reach 80% of that of the integral cast-in-situ composite structure specimen and meet the requirements of the code. After the interface between the new and old concrete is roughened, the ultimate shear capacity of assembled steel-concrete composite structure specimen is increased by 5%, and the ultimate shear capacity of assembled steel-concrete composite structure specimen is increased by 10% when the diameter of the shear reinforcement is increased from 14mm to 20mm.

Keywords:steel-concrete composite structure;assembled structure;pull-out test;load-slip curve;ultimate shear capacity

 

作者簡(jiǎn)介:孫艷寧,碩士,Email:15954785050@163.com;通信作者:孫國富,博士,副教授,Email:gfsunwt@163.com。

下載地址

    你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!

    如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!

    如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!