884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2020年>> 第19期>>正文內(nèi)容
成都建工預(yù)筑科技研發(fā)中心裝配式結(jié)構(gòu)設(shè)計(jì)*
鄧世斌1,許明姣1,畢瓊1,雷雨1,吳靖1,孔文藝2,董博1,李波1
摘 要

(1 中國(guó)建筑西南設(shè)計(jì)研究院有限公司, 成都 610042;  2 成都建工預(yù)筑科技有限公司, 成都 610011)

[摘要]成都建工預(yù)筑科技研發(fā)中心采用裝配整體式框架結(jié)構(gòu),裝配率93%。結(jié)合十三五國(guó)家重點(diǎn)研發(fā)計(jì)劃研究成果,以項(xiàng)目為例闡述了框架梁柱節(jié)點(diǎn)、密拼空心疊合板、雙T板、外墻掛板節(jié)點(diǎn)等設(shè)計(jì)細(xì)節(jié),為同類項(xiàng)目提供參考和借鑒。其中梁柱節(jié)點(diǎn)采取了一系列的措施,在滿足承載力前提下,充分考慮節(jié)點(diǎn)區(qū)鋼筋布置方式,方便預(yù)制構(gòu)件制作和安裝;  密拼空心疊合板和雙T板的應(yīng)用,避免了后澆帶整體式接縫的鋼筋桁架疊合板制作安裝困難、支撐多、造價(jià)高等缺點(diǎn);  外掛墻板節(jié)點(diǎn)不僅能滿足承載力要求,而且能適應(yīng)主體結(jié)構(gòu)變形,安裝方便。

[關(guān)鍵詞]裝配整體式框架結(jié)構(gòu);  高裝配率;  密拼空心疊合板;  雙T板;  外墻掛板節(jié)點(diǎn)

中圖分類號(hào):TU318文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):1002-848X(2020)19-0117-07

 

Design of assembly structure in Chengdu Construction Engineering Pre-built Technology R&D Center

DENG Shibin1, XU Mingjiao1, BI Qiong1, LEI Yu1, WU Jing1, KONG Wenyi2, DONG Bo1, LI Bo1

(1 China Southwest Architectural Design and Research Institute Co., Ltd., Chengdu 610042, China; 2 Chengdu Construction Engineering Pre-built Technology Co., Ltd., Chengdu 610011, China)

Abstract:Chengdu Construction Engineering Pre-built Technology R&D Center adopts an integrated frame structure system, the assembly rate is 93%. Combined with the research results of 13th Five-Year National Key R&D Plan, the project was used as an example to illustrate the design details of frame beam-column joints, hollow close\|fitting composite slabs, double T slabs and external panel joints, providing reference for similar projects. Among them, a series of measures have been adopted for the beam-column joints. Under the premise of satisfying the bearing capacity, the arrangement of steel bars in the joint area is fully considered to facilitate the production and installation of prefabricated components; the application of hollow close-fitting composite slab and double T slab avoids post-casting belts Integral joint reinforced truss composite panels have disadvantages such as difficult production and installation, multiple supports, and high cost; external panel joints can not only meet the requirements of bearing capacity, but also adapt to the deformation of the main structure and are easy to install.

Keywords:assemble integral frame structure; high assembly rate; hollow close-fitting composite slab; double T slab; external panel joint

 

*“十三五”國(guó)家重點(diǎn)研發(fā)計(jì)劃項(xiàng)目(2016YFC0701900)。

 

作者簡(jiǎn)介:鄧世斌,碩士,高級(jí)工程師,Email:29383509@qq.com;  通信作者:許明姣,碩士,高級(jí)工程師,Email:835071966@qq.com。

下載地址

    你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!

    如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!

    如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!