884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2020年>> 第14期>>正文內(nèi)容
不同建造方式管廊結(jié)構(gòu)振動(dòng)臺(tái)模型試驗(yàn)研究*
楊艷敏,范鑫陽(yáng),龔玉寶,王勃,陳宇
摘 要

(吉林建筑大學(xué)土木工程學(xué)院, 長(zhǎng)春 130118)

[摘要]為探究地下綜合管廊腋角高度、建造方式對(duì)管廊結(jié)構(gòu)加速度、層間位移、鋼筋應(yīng)變影響,完成管廊模型地震響應(yīng)振動(dòng)臺(tái)試驗(yàn)。設(shè)計(jì)4個(gè)相似比為1/6的管廊模型,在El Centro波作用下通過(guò)輸入不同的頻率、幅值,研究不同參數(shù)對(duì)管廊動(dòng)力響應(yīng)影響。研究結(jié)果表明:增大腋角高度對(duì)管廊結(jié)構(gòu)加速度的作用易受到管廊結(jié)構(gòu)本身及周圍土體非線性的影響;腋角高度對(duì)裝配式管廊影響大,增大相同腋角高度裝配式管廊結(jié)構(gòu)的層間位移降低30%~50%,而整澆式管廊降低10%~30%;在強(qiáng)震時(shí)建造形式對(duì)加速度及管廊頂板、底板的層間位移影響均較大;增加腋角高度,兩種管廊鋼筋應(yīng)變均變小,裝配式管廊變化大;裝配式管廊鋼筋應(yīng)變大于整澆式管廊鋼筋應(yīng)變。

[關(guān)鍵詞]裝配式管廊; 整澆式管廊; 建造方式; 腋角高度; 振動(dòng)臺(tái)試驗(yàn); 動(dòng)力響應(yīng)

中圖分類號(hào):TU990-3文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):1002-848X(2020)14-0091-06

 

Shaking table model test of pipe gallery structure with different construction methods

YANG Yanmin, FAN Xinyang, GONG Yubao, WANG Bo, CHEN Yu

(School of Civil Engineering, Jilin Jianzhu University, Changchun 130118, China)

Abstract:In order to explore the influence of the height of the corner widening height and the construction method of the underground comprehensive pipe gallery on the acceleration, story displacement and reinforcement strain  of the pipe gallery structure, the shaking table test of the seismic response of the pipe gallery model was completed. Four pipe gallery models with the similar ratio of 1/6 were designed. The effects of different parameters on the dynamic response of pipe gallery were studied by inputting different frequencies and amplitudes under the action of El Centro wave. The results show that  the effect of increasing the corner widening height on the acceleration of the pipe gallery structure is easily affected by the nonlinearity of the pipe gallery structure and surrounding soil; the  corner widening height has a great influence on the fabricated pipe gallery, by increasing the same corner widening height, the fabricated pipe gallery displacement decreased by 30%~50%, while the whole casting pipe gallery displacement decreased by 10%~30% ; in the case of strong earthquake, the construction method has a great influence on the acceleration and the floor displacement of the top and bottom of the pipe gallery; when increasing the corner widening height, the steel strain of two kinds of pipe gallery became smaller and the fabricated pipe gallery changed greatly; the steel strain of the fabricated pipe gallery is larger than that of the whole casting pipe gallery.

Keywords:fabricated pipe gallery; whole casting pipe gallery; construction method; corner widening height; shaking table test; dynamic response

 

*吉林省科技廳重點(diǎn)研發(fā)項(xiàng)目 (20200403071SF),國(guó)家應(yīng)急管理部安全事故防治科技項(xiàng)目(jilin-0001-2018AQ),吉林省教育廳“十三五”科學(xué)技術(shù)項(xiàng)目(JJKH20200281KJ)。

 

作者簡(jiǎn)介:楊艷敏,碩士,教授,博士生導(dǎo)師, Email:282872984@qq.com。

下載地址

    你還沒(méi)注冊(cè)?或者沒(méi)有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!

    如果你還沒(méi)注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!

    如果你已經(jīng)注冊(cè)但還沒(méi)登錄,請(qǐng)趕緊點(diǎn)此登錄吧!