884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2020年>> 第10期>>正文內(nèi)容
高烈度地區(qū)某大底盤多塔層間隔震高層建筑結(jié)構(gòu)方案選型及設(shè)計*
劉付鈞1,2,林紹明2,1,黃忠海1,2,李盛勇1,2,謝聰睿1,2,黃元根1,2
摘 要

(1 廣州容柏生建筑結(jié)構(gòu)設(shè)計事務(wù)所, 廣州 510170; 2 廣州容聯(lián)建筑科技有限公司, 廣州 510170)

[摘要]為達(dá)到建筑使用品質(zhì)及抗震性能的協(xié)調(diào)統(tǒng)一,在高烈度地區(qū)大底盤多塔高層建筑結(jié)構(gòu)采用層間隔震技術(shù)是一種有效的解決方案。通過對某大底盤多塔高層建筑的結(jié)構(gòu)方案比選分析,最終采用層間隔震技術(shù)方案,并對其地震反應(yīng)及抗震性能進(jìn)行了分析研究。結(jié)果表明:層間隔震技術(shù)整體減震效果良好,可以大幅減小地震反應(yīng),是提高結(jié)構(gòu)抗震安全性的有效手段;綜合考慮項目結(jié)構(gòu)特點(diǎn)、經(jīng)濟(jì)性及建筑品質(zhì)的提升,在高烈度區(qū)大底盤多塔結(jié)構(gòu)中采用層間隔震技術(shù)是一種優(yōu)選的實(shí)施方案;最后針對大底盤層間隔震技術(shù)的組合隔震方案、隔震支座附加彎矩、支座抗拉裝置等若干關(guān)鍵技術(shù)問題進(jìn)行討論,可為類似工程實(shí)踐提供參考。

[關(guān)鍵詞]高烈度地區(qū); 大底盤多塔結(jié)構(gòu); 高層建筑; 層間隔震技術(shù)

中圖分類號:TU352-1, TU973+.2文獻(xiàn)標(biāo)識碼:A文章編號:1002-848X(2020)10-0083-07

 

Structural scheme selection and design of an isolated high-rise building structure with a large chassis and multiple tower-layer in a high-intensity region

LIUFU Jun1,2, LIN Shaoming2,1, HUANG Zhonghai1,2, LI Shengyong1,2, XIE Congrui1,2, HUANG Yuangen1,2

(1 RBS Architecture Engineer Design Associate, Guangzhou 510170, China;2 RBS Partners S&T Co., Ltd., Guangzhou 510170, China)

Abstract:In order to achieve the harmonization of the quality of the building and the seismic performance, it is an effective solution to adopt the story isolation technique in the large chassis and multiple tower-layer high-rise building structure in high intensity region. Through the comparison and analysis of the structural schemes of a large chassis  multiple tower-layer high-rise building, the ultimate seismic isolation scheme was adopted, and its seismic response and seismic performance were analyzed and studied. The results show that the overall seismic isolation effect of the story isolation technique is good, which can greatly reduce the seismic response, and is an effective means to improve the seismic safety of the structure; Considering the structural characteristics of the project, the improvement of the economy and the quality of the building, the use of story isolation technique in the large chassis multiple tower-layer structure in the high intensity region is an optimal scheme; Finally, several key technical issues such as the combined seismic isolation scheme of large chassis story isolation technique, the additional bending moment of the  isolator, and the tensile device of the isolator were discussed, which can provide reference for similar engineering practices.

Keywords:high intensity region; large chassis and multiple tower-layer structure;   high-rise building; story isolation technique

 

*廣州市科技計劃項目(201906010012),廣州市創(chuàng)新創(chuàng)業(yè)領(lǐng)軍團(tuán)隊項目(CYLJTD\|201608),廣州市科技計劃項目(201704020172)。

 

通訊作者:林紹明,博士,高級工程師, Email:linshaoming@gzrbs.com。

下載地址

    你還沒注冊?或者沒有登錄?這篇論文要求至少是本站的注冊會員才能閱讀!

    如果你還沒注冊,請趕緊點(diǎn)此注冊吧!

    如果你已經(jīng)注冊但還沒登錄,請趕緊點(diǎn)此登錄吧!