884aa四虎影成人精品,99久久国产综合精品女图图等你,97在线观看永久免费视频,久久精品国产精品亚洲38,ⅵdeodesetv性欧美

您現(xiàn)在的位置:建筑結(jié)構(gòu)>> 期 刊>> 2020年>> 第08期>>正文內(nèi)容
某超限高層建筑寬梁轉(zhuǎn)換體系設(shè)計(jì)
袁理明,黃銀燊,王小南,陳念
摘 要

(中南建筑設(shè)計(jì)院股份有限公司, 武漢 430071)

[摘要]貴陽保利國際廣場(chǎng)3號(hào)樓為結(jié)構(gòu)體系特別不規(guī)則的超限高層建筑,其上部不規(guī)則布置的剪力墻與下部裙房大柱網(wǎng)之間的荷載傳遞較為復(fù)雜,需要設(shè)置高位轉(zhuǎn)換層。為明確整體結(jié)構(gòu)荷載傳遞路徑,緩解高位轉(zhuǎn)換產(chǎn)生的剛度弱化,提高結(jié)構(gòu)整體抗震性能,本工程采用寬梁轉(zhuǎn)換體系。根據(jù)相關(guān)規(guī)范及技術(shù)要點(diǎn)要求,先從整體上對(duì)結(jié)構(gòu)進(jìn)行抗震性能分析,再結(jié)合有限元軟件對(duì)結(jié)構(gòu)中至關(guān)重要卻相對(duì)薄弱的轉(zhuǎn)換層樓板及轉(zhuǎn)換梁進(jìn)行了詳細(xì)有限元分析,最后依據(jù)相關(guān)規(guī)范對(duì)寬梁轉(zhuǎn)換構(gòu)件進(jìn)行設(shè)計(jì)及復(fù)核。結(jié)果表明,該寬梁轉(zhuǎn)換體系的設(shè)計(jì)符合規(guī)范要求,可供其他工程中轉(zhuǎn)換層設(shè)計(jì)參考。

[關(guān)鍵詞]貴陽保利國際廣場(chǎng); 超限高層建筑; 寬梁轉(zhuǎn)換體系; 高位轉(zhuǎn)換

中圖分類號(hào):TU398+.9, TU391文獻(xiàn)標(biāo)識(shí)碼:A文章編號(hào):1002-848X(2020)08-0088-07

 

Design of wide beam transfer system in an out-of-code high-rise building

YUAN Liming, HUANG Yinshen, WANG Xiaonan, CHEN Nian

(Central-South Architectutal Design Institute Co., Ltd., Wuhan 430071, China)

Abstract:The Building 3 of Poly International Plaza in Guiyang is an out-of-code high-rise building with a particularly irregular structural system. The load transfer between the irregular shear wall on the upper part and the large column network of the lower podium is complex, so it is necessary to set a high-level transfer layer. The wide beam transfer system is adopted in the project in order to define the load transfer path of the whole structure, alleviate the stiffness weakening caused by high-level transfer, and improve the overall seismic performance of the structure. According to the relevant specifications and technical requirements, the seismic performance of the structure was analyzed on the whole, and then the finite element software was used to conduct the detailed finite element analysis on the transfer layer and transfer beam, which were very important but relatively weak in the structure. At last, the wide beam transfer members were designed and rechecked according to relevant codes. The results show that the design of the wide beam transfer system meets the requirements of the code, which can be used as a reference for the design of transfer layer in other projects.

Keywords:Poly International Plaza in Guiyang; out-of-code high-rise building; wide beam transfer system; high-level transfer

 

作者簡(jiǎn)介:袁理明,學(xué)士,高級(jí)工程師,一級(jí)注冊(cè)結(jié)構(gòu)工程師,Email: 175848388@qq.com。

下載地址

    你還沒注冊(cè)?或者沒有登錄?這篇論文要求至少是本站的注冊(cè)會(huì)員才能閱讀!

    如果你還沒注冊(cè),請(qǐng)趕緊點(diǎn)此注冊(cè)吧!

    如果你已經(jīng)注冊(cè)但還沒登錄,請(qǐng)趕緊點(diǎn)此登錄吧!