【提要】 將剛性基礎(chǔ)基底反力的計算方法用于樁位偏差時各樁頂豎向力的計算。以四樁樁基與三樁樁基為例,分別計算了其中一樁樁位發(fā)生偏差時各樁豎向力的數(shù)值。計算結(jié)果表明,當(dāng)其中一根樁的樁位偏差在規(guī)范規(guī)定范圍以內(nèi)時,各樁豎向力的變化大致在10%以內(nèi);當(dāng)其中一根樁的樁位偏差達(dá)一倍樁徑時,對四樁樁基,基樁豎向力變化最大可達(dá)30%;對三樁樁基,最大可達(dá)60%。
【關(guān)鍵詞】 樁位偏差 剛性基礎(chǔ) 豎向力 樁基礎(chǔ)
Analysis of the Vertical Force Change in the Pile Foundation Induced by the Error of a Pile Position/Dong Qinghua(Department of Civil Engineering,Wuyi University,Jiangmen 529020,China)
Abstract:Calculation method of foundation pressure of rigid foundation is used to calculate the change of vertical force on pile top induced by the error of a pile position.The change of vertical force on every pile in fourpile or threepile foundation is calculated separately when any piles position emerges the error.The results show that,whether fourpile or threepile foundation,if the error of a pile position is within the limit set by the code,the change of vertical force on every pile is within about 10%;if the error of a pile position equals to a piles diameter,the maximum change of the vertical force on the pile is about 30% for fourpile foundation and about 60% for threepile foundation.
Keywords:error of a pile position;rigid foundation;vertical force;pile foundation
- 下載地址
-